My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-10-28 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-10-28 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 1:14:56 PM
Creation date
10/25/2019 8:11:45 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
10/28/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.D. - Page 16 of 30 <br />drop in battery prices. 29 In San Mateo County, both Pacific Gas & Electric and Peninsula Clean <br />Energy both offer 100 percent renewable electricity plans.30,3I <br />"Most modern chargers and vehicles have a standard connector and receptacle, called the SAE <br />J1772. Any vehicle with this plug receptacle can use any Level 1 [120 volt AC] or Level 2 [240 <br />volt AC] EVSE. All major vehicle and charging system manufacturers support this standard. ,32 <br />And recently, "SAE International, an engineering standards -setting organization, has passed a <br />standard for fast charging that adds high-voltage DC power contact pins to the SAE J1772 <br />connector,"33 so standardization of charging infrastructure should soon no longer be a concern. <br />As with individuals who purchase ZEVs, city and county governments will need to install <br />charging infrastructure for their fleets. The cost of installing a charging facility ranges widely <br />depending on the number of charging ports, the level of the charger, whether the units are <br />networked for monitoring and/or billing purposes, and the proximity to existing electrical <br />infrastructure. 34 However, in considering the useful range of their ZEVs, cities in San Mateo <br />County should also take into account that there are currently 1,645 public charging stations in <br />San Mateo County that could be used by government vehicles if they are in danger of running <br />out of power before being able to return to their base charging location. 35 <br />Even with all of these advances, in January 2019 Forbes Magazine listed the four lingering <br />obstacles that purchasers of ZEVs, both public and private, contend with as perceived cost, range <br />anxiety, driver understanding, and dealer understanding. 36 Driver and dealer understanding of <br />ZEVs will come with greater education of the public, and the Grand Jury hopes that this report <br />will contribute to that education. Retraining of mechanics to work on ZEVs is also a <br />consideration, especially for government employees. However, according to the San Mateo <br />County Department of Public Works, "This doesn't present a problem and... mechanics are being <br />trained on servicing of the EVs."37 <br />"By a margin, the largest reason that consumers have avoided purchasing an electric car is range <br />anxiety. That is, 58 percent of drivers are afraid that they will run out of power before being able <br />29 Supra, Note 26 <br />31 Pacific Gas & Electric website, "Solar Choice program costs". https://www.pge.com/en_US/residential/solar-and- <br />vehicles/options/solar/solar-choice/rate-calculator.page <br />31 Peninsula Clean Energy website, "Where PCE's Power Comes From". <br />htlps://www.peninsulacleanenergy.com/energy-sources/ <br />32 U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, "Vehicle Charging". <br />htt2s://www.energy.gov/eere/electricvehicles/vehicle-charging <br />33 Ibid. <br />3' New York State Energy Research and Development Authority, "Charging Station Installation Analysis: Tompkins <br />County Plug-in Electric Vehicle Infrastructure Plan", February 2017. <br />http://tompkinscoggtygy.gov/files2/itctc/projects/EV/Tompkins%2OEV SE%20Installation%2OAnalysis%20FINA-L.pdf <br />31 San Mateo County Datahub, "Electrical Vehicle Charging Stations". <br />https://datahub.smcgov.or /g Transportation/Electric-Vehicle-Charging-Stations/k4h3-. <br />36 Jeff McMahon, "The 4 Lingering Obstacles To Electric Vehicle Adoption (And What Might Overcome Them)", <br />Forbes, January 27, 2019. https://www.forbes.com/sites/jeffmcmahon/2019/01/27/the-4-lingering-obstacles-to- <br />electric-vehicle-adoption-and-what-might-overcome-them/#2224ba695 c54 <br />37 Grand Jury communication. <br />2018-2019 San Mateo County Civil Grand Jury 9 <br />M <br />
The URL can be used to link to this page
Your browser does not support the video tag.