My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2007-12-17
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2007
>
AgdaPkt 2007-12-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2013 12:50:48 PM
Creation date
12/13/2007 4:29:15 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
12/17/2007
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
671
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7C <br /> Page 30 <br /> Mitigation 6-1: lmplement the mitigation measures identified in other sections of <br /> this EIR re[ated to project population-induced environmen#af impacts (TransporEation and <br /> Circula�ion, l�frasfru�ture an� Public S�rvices, Noise, and Air Quality). Those mitigations <br /> identi�ed in the 2003 EIR for Impact 6-1 that would remain applicable to the current Peninsula <br /> Park project are: <br /> 1. Traffic Mitigations 7-7 through 7-17; <br /> 2. Publfc Service Mitigations 10-4 through 10-7 and 'i0-9; <br /> 3. Noise Mitigations 13-1 and 13-2; and <br /> 4. Air Quality Mitigation 15-1. <br /> Due to the overall reduction in residential and cammercial devefopment proposed <br /> by the current Peninsula Park project, the folfowing mitigation measures ideniified in the 2003 <br /> E!R are no longer necessary, ar have been modified t�address the revised project, as identi�ed <br /> thraughout this Addendum: <br /> 1. Traffic Mitigations 7-1 througF� 7-6 and 7-18 through 7-27 (all eliminated); <br /> 2. Public Service Mitigstions 10-1, 10-2, and 10-8 {afl modified); <br /> 3. Noise Mitigation 13-3 (modified}; and <br /> 4. Air Quaiity Mi#igation 15-2 (efiminated). <br /> Findings: Implementation of the retained or modified measures identifisd above <br /> wnuld reduce identified environmentai impacts associated with the project-relafed population <br /> increase to a less-than-significant level, with the exception of the curnulative with project <br /> traffic impact on the Ef CaminolWhipple Avenue intersection (Impact 7-15), which woufd remain <br /> significant and unavoidable. Due to right-of-way ar�d physical constraints, both of the <br /> mitigation alternatives discussed in Mitiga#ion 7-15 are deemed infeasibie. Such changes or <br /> alterations are within the responsibi{ity and jurisdiction of either Caltrans or the Peninsula <br /> Corridor Jaint Powers Board (Caltrain) and not the City of Redwood City. Such changes can or <br /> should be adopted by Caltrans or Caltrain. This impact is alsa overridden by project benefrts as <br /> set farth in t�e stateme�t of overrid�rr� conside�atians. <br /> B. Ernplovment Growth <br /> Pofiential Impact 6-2: This praject-related local employment growth (estimated <br /> at 125 new employees} has the potential to result in employment-re{ated environmental effects <br /> (traffc, public services, noise, and air quality) as described in corresponding chapters of the E!R <br /> (see chapters 7, 10, 13, and 15}, representing a potential(y signi�cant project and cumulative <br /> impact. <br /> Mitiga#ion 6-2: Implement the mitigation measures identified in other sections of <br /> this table related to project employment-related enviranmental impacts (Transportation and <br /> Circulation, Infrastructure and Public Services, Noise, and Air Quality). Those m�tigations <br /> identified in the 2003 EIR for Impact 6-2 that would remain applicable to the current Peninsula <br /> park projecf are: <br /> Atty/Reso/Reso.1772 g <br /> 121307 <br />
The URL can be used to link to this page
Your browser does not support the video tag.