My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2007-12-17
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2007
>
AgdaPkt 2007-12-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2013 12:50:48 PM
Creation date
12/13/2007 4:29:15 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
12/17/2007
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
671
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7C <br /> Page 33 <br /> projecf impact at the Bfomquist Street/Maple Street intersection (see Secondary Impact 7-10A <br /> which follows). <br /> Findings: The extension of Blomquist Street over Redwood Creek to the East <br /> Bayshore/Bair Island Road intersection would reduce the impact described above ta a iess- <br /> than-significant level. <br /> E. Proiect-Related Secondarv lmpact of the Blomquist Extension on the <br /> Blomquist StreetlMaqle Street Intersection. <br /> Secondary Impac# 7-10A: With completion of the Blomquist Street Extension, <br /> the Blomquist StreeUMaple Street intersection wauld be expected to operate at LOS C <br /> (acceptable} conditions during the AM peak hour and LOS F (unacceptabfe) conditions during <br /> the PM peak hour under Background Conditions. W'rth the addition of the project traffic, <br /> operations at the intersection would be expected to degrade to LOS D (acceptable) conditions <br /> during the AM peak hour and worse �OS F (unacceptabfe) condifions during the PM peak hour. <br /> The change in the PM average delay at #he intersection due to the project is expected to be <br /> more than 5.0 seconds. The intersection is also expected to satisfy the Caftrans Peak-Hour <br /> Volume Warrant for trafifc signal installation during the PM peak hour under Project Conditions. <br /> These secondary effects of Mitigation 7-10, the Bfomquist Street Extension, would represent a <br /> significanf secondary impacf. <br /> Secondary Mitigation 7-1QA. To mitiga#e project-related secondary traffic <br /> impacts at the Blomquist Streefi/Mapfe Street intersection: (a)the intersecfion shall be four-way <br /> s#op-controlled; and (b)the northbound approach shall be widened #o incfude a dedicated {eft <br /> turn lane and a shared through/right-turn {ane. With these impravements, the intersectiat� is <br /> expected to operate at LOS C during the AM and PM peak hours under Project Conditions. <br /> Altematively, install a traffic signal at #he intersection. With signafiza#ion, the <br /> intersection is expected to operate at LOS B during the AM and PM peak hours under Project <br /> Conditions. <br /> Or, as a third alternative, ins#a!I a rou�dabout at#he intersec#ion. With #he <br /> roundabout, the intersection would operate at LOS A during the AM and PM peak hours under <br /> Project Condi#ians. <br /> Implementation of ane of these secondary mitiga#ion aiternatives to City <br /> satisfaction wouVd be a Praject responsibifity. <br /> Findings: fmplementation of any one ofi these three mitigation alternatives <br /> woufd reduce the project's secondary impact at the Blomquist StreetlMaple Street in#ersection <br /> to a less-than-signi�cant leveL <br /> F. Proiect lmpacts an C/CAG's Conqestion Manactemertt Plan (CMP) Roadwav <br /> Network--AM and PM Peak Hours. <br /> Potential Impact 7-11: The proposed projec# is expected #o generate 320 net <br /> new peak-hour trips during the AM peak hour and 342 net new peak-hour trips during the PM <br /> peak hour. Because the project trip generation rate is more than 100 net new peak-hour trips <br /> and the project is subject to CEQA review, the proposed project must meet the requirements <br /> presented in the C/CAG Guidelines for the Implementation of the Land Use Component of the <br /> Atty/Reso/Reso_1772 1� <br /> 121307 <br />
The URL can be used to link to this page
Your browser does not support the video tag.