My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2008-01-28 Clsd and Reg
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2008
>
AgdaPkt 2008-01-28 Clsd and Reg
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2008 11:25:42 AM
Creation date
1/24/2008 4:31:14 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
1/28/2008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />7A <br />Page 52 <br /> <br />Upon receipt of HCD's review letter, we will work with staff to draft changes to the Housing <br />Element to respond to HCD concerns. All proposed changes to the Housing Element will be <br />prepared in underline/strikeout format. Typically, two reviews by HCD are required (each of <br />which may take up to 60 days) to achieve certification. Our budget includes an allowance for <br />consultation/negotiation with HCD staff. Any time required beyond this allowance to address <br />BCD's comments and concerns will be billed on a Jeimbursablebasis with prior authorization <br />from the City. <br /> <br />In some cases, BCD may require changes to the Housing Element that are not consistent with <br />local policy direction and thus HCDcertification cannot be achieved. In that event, we can assist <br />the City in preparing written findings to be included in the resolution of adoption to provide the <br />reasons justifying how the Housing Element substantially complies with the requirements of state <br />law. Such services will be provided at an additional cost. <br /> <br />9.2 Commission Study Sessions <br /> <br />We understand that there are some seven City Commissions that will review all or part of the <br />General Plan prior to the initiation public hearings. As such, we propose to convene four 2-hour <br />study sessions for the various commissioners to attend. The four study session topics could be: <br /> <br />1) Land Use/Design/Circulation Element, Economic Development, and Housing Element <br />2) Parks and Recreation Element .and Natural Resources Element <br />3) Cultural Resources Element and Human Needs Element <br />4) Infrastructure Element and Public Safety Element <br /> <br />We will provide a hard copy and an electronic file of all study session materials for the City to <br />reproduce and distribute to the commissioners. In addition, the City staff would be responsible for <br />study session facilities and logistics. <br /> <br />9.3 Planning Commission - Public Hearings (allowance) <br /> <br />Laura Stetson, Lisa Brownfield, Phyllis Potter, SohrabRashid, Dena Belzer, and/or other key <br />team members will be available to attend Planning Commission hearings to present the Draft <br />General Plan and DEIR and to respond to public and Commission comments and questions. Our <br />fee proposal includes a budget allowance for attending Planning Commission hearings. <br />Attendance at hearings in excess of this allowance may require either a budget amendment or <br />modification to another portion of this scope of work. <br /> <br />9.4 City Council -Public Hearings (allowance) <br /> <br />Laura Stetson, Lisa Brownfield, Phyllis Potter, and Sohrab Rashid are available to attend City <br />Council hearings to present the Draft General Plan and Specific Plan, and to respond to public <br />and Council comments and questions. Other members of the project team will be available to <br />attend on a reimbursable basis. Our fee proposal includes a bUdget allowance for attending City <br />Council hearings. Attendance at hearings in excess of this allowance may require either a budget <br />amendment or modification to another portion of this scope of work. <br /> <br />Task 10. Final Documents and Housing Element Certification <br /> <br />10.1 Prepare Final General Plan (allowance) <br /> <br />SCOPE OF SERVICES <br />Redwood City General Plan <br />January 11, 2008 <br />Page 37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.