Laserfiche WebLink
<br />8A <br />Page 16 <br />(provided to City Council previously via a memo) <br /> <br />Response Matrix: Precise Plan Comments and Revisions <br />The Preserve at Redwood Shores <br />City Council Meeting - 1.28.08 <br /> <br />Recommendation <br />No changes to the Precise Plan <br /> <br />Response <br /> <br />Parking requirements are provided in <br />Development Standard #13 on pg. 41 of the <br />Draft Precise Plan. <br /> <br /># Comme~ <br />- <br />27. Circulation, Townhomes, General- if there are <br />any required parking spaces within either of the <br />two town home developments, it should be <br />clearly stated and documented. <br /> <br />No changes to the Precise Plan <br /> <br />28. Pedestrian and Bicycle System - a complete All proposed pedestrian and bike paths are <br />sidewalk and bicycle path should be installed planned to connect to existing facilities of equal <br />New sidewalks should connect to existing ones or greater capacity. Refer to Figure 41 on pg. <br />and new bicycle path should connect to an 59 of the Draft Precise Plan for further details. <br />existing one. Sidewalks and bicycle paths that <br />do not connect are unacceptable <br /> <br />No changes to the Precise Plan <br /> <br />29. Bicycle Lane Along Shearwater - a new bicycle Because only a short segment of Shearwater <br />lane is being installed on Marine and Redwood Parkway is being widened for this project, it wi <br />Shores Parkway. Will a bicycle lane be added be designed to meet the existing conditions on <br />on Shearwater and will the new alignment either side. Marine and Shearwater Parkways <br />accommodate the bicycle lane? do include a pedestrian and bicycle trail <br />adjacent to the roadway but do not include an <br />on-street bike lane at this location. <br /> <br />Amend the Precise Plan. See <br />recommendation for comment 13. <br /> <br />See response to comment 13 <br /> <br />30. Utilities, Recycled Water, page 62 - ful <br />declaration of what will be watered with <br />recycled water is requested along with <br />incorporation of the work of the Recycled Water <br />Task Force <br /> <br />Amend the Precise Plan. See <br />recommendation for comment 11 <br /> <br />See response to comment 11 <br /> <br />Utilities, Storm Drainage, page 63 - references <br />throughout the report are that all storm water wi <br />be treated on-site. Is it the intent to treat all <br />the 100-year <br /> <br />31 <br /> <br />9 of 13 <br /> <br />stormwater on-site other than <br />storm? <br />