My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2008-01-28 Clsd and Reg
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2008
>
AgdaPkt 2008-01-28 Clsd and Reg
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2008 11:25:42 AM
Creation date
1/24/2008 4:31:14 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
1/28/2008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />8A <br />Page 17 <br /> <br />Attachment 4 <br /> <br />MITIGATION MONITORING AND REPORTING PROGRAM <br /> <br />This Mitigation Monitoring and Reporting Program (MMRP) is based on the findings of the <br />Environmental Impact Report (EIR) for the Preserve at Redwood Shores. This MMRP complies with <br />Section 15097 of the CEQA Guidelines, which requires that the Lead Agency "adopt a program for <br />monitoring or reporting on the revisions which it has required in the project and the measures it has <br />imposed to mitigate or avoid significant environmental effects." The MMRP lists mitigation measures <br />recommended in the EIR and identifies mitigation monitoring requirements. <br /> <br />Table 1 presents the mitigation measures identified for the proposed project. Each mitigation measure <br />is numbered according to the topical section to which it pertains in the EIR. As an example, <br />Mitigation Measure AIR-I is the first mitigation measure identified in the section regarding Air <br />Quality. <br /> <br />The column entitled "Mitigation Responsibility" identifies the party responsible for carrying out the <br />required actions. The columns entitled "Monitoring/Reporting Agency and "Monitoring Schedule" <br />identify the party ultimately responsible for ensuring that the mitigation measure is implemented and <br />the approximate timeframe for the oversight agency to ensure implementation of the mitigation <br />measure. <br /> <br />This MMRP is for the portions of the project under the control of the City. The project sponsor will <br />do the initial site preparation, including rough grading, for the whole project site, including the school <br />site. The school site will be established as a separate parcel and conveyed to the Belmont-Redwood <br />Shores School District for the remaining development of the school site. Therefore, this MMRP does <br />not include MMRP provisions for the school site development. Development of the school site will be <br />under the control of the Belmont-Redwood Shores School District which will have to adopt its own <br />MMRP as part of proceeding with school site acquisition and development. All mitigations from the <br />ErR are included in this table, even if they apply only to the school site. <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.