Laserfiche WebLink
<br /> 'IHE PRJ;SERVE AT RJ;DWOOD SHORES EIR <br /> M GATION MONITORING AND REPORTING PROGRAM <br /> --- ~-~~-"._,- ~--.~..-_._--_...._-- <br /> -. <br />Mitigation Responsibility I Monitoring/Reporting ~gency --.Monitoring Schedule <br /> <br />LSA ASSOCIATES. INC. <br />JANt'ARY Zl108 <br />. . _._-_..~ ....."..-.... <br />Table continued <br /> - <br /> Mitigation Measures <br /> <br />HYD- I a Continued <br /> <br />To educate on-site personnel and maintain awareness of the <br />importance of stormwater quality protection, site supervisors shal <br />conduct regular tailgate meetings to discuss pollution prevention. <br />The frequency of the meetings and required personnel attendance <br />list shall be specified in the SWPPP. <br /> <br />The SWPPP shall specify a monitoring program to be implemented <br />by the construction site supervisor, and shall include both dry and <br />wet weather inspections. In addition, in accordance with State <br />Water Resources Control Board Resolution No. 2001-046, <br />monitoring shall be required during the construction period for <br />pollutants that may be present in the runoff that are "not visually <br />detectable in runolf" The developer shall retain an independent <br />monitor to conduct weekly inspections and provide written monthly <br />reports to the Redwood City Public Works Department and/or <br />Building Division to cnsure compliance with the SWPPP. RWQCB <br />personnel, who may makc unannounced site inspections, are <br />empowered to lcvy fincs ifit is determined that the SWPPP has not <br />been pr()p~epared and implemented. <br /> <br />Prior to the issuance of any grading <br />or building permits. <br /> <br />-. <br />The Engineering and Construction <br />Department shall review the <br />drainage plan and development <br />drawings submitted by the project <br />sponsor to ensure that they are in <br />compliance with this mitigation <br />measure. <br /> <br />-.. <br />The project sponsor shall <br />incorporate all appropriate Best <br />Management Practices (BMPs) <br />with respect to the Stormwater <br />Pollution Prevention Program into <br />the project's final drainage plan <br />and development plans, except for <br />the school site development <br /> <br />""U <br />Q) <br />CO <br />CD <br />NO:> <br />0:>)> <br /> <br />12 <br /> <br />To be addressed in the Belmont- <br />Redwood Shores School District <br />MMRP for the school site <br /> <br />Note: Planning Commission changes are shown as strike thru and underlined text <br />U:\My Documents\Area H\MMRP\Clean Preserve MMRP with PC changes 1.28.08.doc <br /> <br />construction. <br /> <br />HYD-Ib: The project applicant and the School Distnct shall fully <br />comply with the San Mateo County Countywide Stormwater <br />Pollution Prevention Program (STOPPP) which maintains <br />compliance with the NPDES Stoml Water Discharge Permit <br />Responsibilities include, but are not limited to, designing BMPs <br />into the projcct features and operation to reduce potential impacts to <br />surface water quality associated with operation of the project These <br />features shall be included in the project drainage plan and final <br />developmcnt drawings. Specifically, the final design shall include <br />measures designed to mitigate potentia] water quality degradation of <br />runoff from all portions of the completed development. <br />(Continued on the next page) <br />.~.__.~--_. <br />