My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2008-01-28 Clsd and Reg
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2008
>
AgdaPkt 2008-01-28 Clsd and Reg
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2008 11:25:42 AM
Creation date
1/24/2008 4:31:14 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
1/28/2008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />6.1E <br /> <br />As the right column in the table above shows, staff did not request that the Council Page 2 <br />authorize additional funds in August 2006, because the pace of spending in the <br />previous year was significantly less that originally expected. The primary reason for this <br />shift was that the project team amended its approach to the irrigation site retrofits, and <br />instead of scheduling construction on customer sites ahead of installation of distribution <br />pipelines, the work was pushed back to immediately follow pipelines. This provided <br />more time for acquiring custorner applications for service, gain design approval from the <br />State Dept. of Health Services (now the State Dept. of Public Health), and finally to <br />negotiate and receive site entry agreements for each customer site. Since this pre- <br />retrofit work was accomplished by several project tearn members working together, the <br />average monthly costs for Kennedy/Jenks services were relatively low. However, since <br />Retrofit Bid Package No. 1 was awarded in the spring of 2007, the arnount of time <br />required of K1J staff has increased and will stay at the previously-projected peak level, <br />as all remaining commercial and streetscape irrigation retrofits of the 57 are approved <br />and constructed in Redwood Shores and the Seaport area. Any homeowner <br />association sites that may voluntarily apply for service are not included in the scope of <br />this agreement. <br /> <br />The design and construction of site retrofits has proven more complex than originally <br />anticipated due to the need to convert multiple meters at many sites. Staff has <br />concluded that the original assumptions about the level of effort required for site retrofits <br />were low and certain sites with multiple meters require a higher level of effort to retrofit <br />all irrigation meters. Additionally, the project team has determined that the irrigation site <br />retrofits should be bid in several bid packages instead of in a single bid package as <br />initially envisioned. K/J will continue to provide support with bidding and CM services for <br />these additional bid packages as well as for additional customer site supervisor training. <br />And finally, K1J expertise in the team will support a learning process for new Public <br />Works Services employees, who will follow up the initial retrofits with continuing;'iff';:~ <br />customer service, regulatory inspections and reporting, and problem-solving as needed.' . <br /> <br />K/J will continue to provide technical support and assistance to industrial customers in <br />the Seaport area for their process plant retrofits. Staff has concluded that the original <br />team assumptions about the level of technical/regulatory support services that industrial <br />customers will need for successful completion of retrofit designs were too conservative. <br />What has been learned in working with businesses in the Seaport Area is that <br />technical/operation staff members and their consultants need more guidance and <br />problem-solving help in order to correctly design changes for maximizing the use of <br />recycled water. The team feels that adding K/J resources, as well as other project <br />assistance is vital to reaching the goal of maximum industrial conversions by 2010. <br /> <br />The anticipated outcorne of the changes, emerging challenges. and adding additional <br />retrofit sites as described above is that the project will require a higher level of effort in <br />Phase One than originally estimated. Staff expects to return to Council in early 2009 <br />with an additional amendment to this agreement, which will be based on a rnore refined <br />understanding of needs. In the interim, staff recommends that the City Council approve <br />the remaining 35% of funding authorization, amending the Agreement in the not-to- <br />exceed amount of $574,200, from $1,066,200 to $ 1,640,400. At the current <br />expenditure rate, this amendment should sustain work through at least the end of 2008. <br /> <br />ALTERNATIVES <br />The work included in the scope of services could be provided by adding city staff for the <br />remaining project period (2008 through 2010). However, this would entail at least six <br />
The URL can be used to link to this page
Your browser does not support the video tag.