My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2008-01-28 Clsd and Reg
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2008
>
AgdaPkt 2008-01-28 Clsd and Reg
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2008 11:25:42 AM
Creation date
1/24/2008 4:31:14 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
1/28/2008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />6.1E <br />Page 19 <br /> <br />It is anticipated that 214 labor hours will be required for Construction Management Services for <br />the Group 1 Bid. <br /> <br />Task 8.4 - Cross-Connection Testing and Conversion <br />Consultant shall provide oversight during the cross-connection tests. These tests will be <br />conducted by the contractor and performed before connecting the Customer's recycled water <br />system to the Water Utility's recycled water system at any use-site where both recycled and <br />potable water are present. It is anticipated that 3 labor hours per site will be required for Cross- <br />Connection Testing and Conversion. <br /> <br />Task 8.5 - Coordinate Final Inspections and Contract Close-out <br /> <br />Consultant will coordinate with the Program to conduct a final on-site inspection to satisfy State <br />DHS requirements. This inspection will be coordinated with the final cross-connection test and <br />will cover the following: <br />. Check for use of proper equipment for retrofit installation <br /> <br />. Placement of all required tags, labels and signs <br /> <br />. Check for runoff or windblown spray outside the approved use area <br /> <br />. Check for ponding of recycled water within the use area <br /> <br />. Check spray patterns for encroachment on public facilities <br /> <br />It is anticipated that three labor hours will be required for final inspections and close out for each <br />site. <br /> <br />Task 9 - Customer Site Supervisor Training <br /> <br />Consultant shall assist City in conducting a formal training program for Customer Site <br />Supervisors prior to the scheduled retrofit start-up date. The training program will need to fulfill <br />the requirements of the Discharge Permit for Water Recycling and the California Department of <br />Health Services requirements. Sufficient training sessions shall be convened by the City to <br />adequately train all customers and comply with the Discharge Permit for Water Recycling. The <br />City will schedule the customer site training sessions. Up to 80 labor hours of support are <br />budgeted for customer training on an as-requested basis. <br /> <br />Task 10 - As-Built Site Retrofit Documents <br /> <br />Submit to City hard copy of drawings and specifications showing record information that <br />Consultant considers significant and accurate based on the drawings, shop drawings and other <br />record documents as annotated by Contractor to show all changes made during construction and <br />furnished to Consultant. It is anticipated that 5 labor hours will be required to provide as-built <br />drawings for each site. <br /> <br />Task 11 - Program Management Support Services <br /> <br />Agreement over $1 OK <br />KennedyJenks Rev-2 112603 <br /> <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.