My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt20 Toole Design Group
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2020
>
Under 60K
>
Agmt20 Toole Design Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2021 9:33:19 AM
Creation date
1/3/2020 4:47:08 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Toole Design Group
PROJECT NAME
Vera Ave Bicycle Blvd project management
RMP File Number
304.5
Date
1/2/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
INVOICES <br />Consultant shall submit monthly invoices to the City, including labor, direct costs, and <br />supporting receipts for the direct costs. The invoices shall include billed and remaining <br />budget for each task, and shall be supplemented with a summary of tasks done during <br />the invoicing period. <br />TASK 1 DELIVERABLES <br />• Attendance at project kickoff meeting, <br />• Kickoff meeting summary distributed within five business days after the meeting <br />Attendance in bi-weekly progress check-in calls, as needed <br />• Agenda for check-in meetings <br />• Meeting and conference call summaries <br />• Monthly invoicing and progress reports <br />• Quality assurance/quality control reviews prior to milestone deliverables <br />Setting up data sharing portal <br />TASK 2: PRE- AND POST -PROJECT EVALUATION AND DATA COLLECTION <br />Consultant and city staff shall conduct a walking/biking site visit along the study corridor <br />to assess current conditions. Consultant shall prepare aerial -based maps and summary <br />of existing data to help identify key areas of concern/priority. Prior to the site visit, <br />consultant shall review and summarize all available data and also determine where data <br />gaps may exist. City will provide any available data to the consultant prior the kickoff <br />meeting. <br />The pre- and post -construction evaluation shall focus on variables such as speed, usage <br />and volume, and crash data analysis. Pre and post project data shall be analyzed, with <br />particular concentration on countermeasures that may directly influence this data. <br />Consultant shall prepare a data collection and existing condition analysis memorandum <br />summarizing available data, data gaps, analysis findings, and strategies for the post - <br />construction evaluation. The memorandum shall outline a formal strategy for a post - <br />construction evaluation that the City will lead with support from the consultant, including <br />data collection types and locations, analysis methodology, and a simple spreadsheet for <br />outputs. <br />TASK 2 DELIVERABLES <br />Data collection and existing conditions analysis memorandum <br />TASK 3: DEVELOPMENT OF IMPROVEMENT CONCEPTS (15% DESIGN) <br />Consultant shall prepare 15% concept design plans for Vera Avenue that include <br />pavement markings, signage, and traffic calming elements (e.g., speed cushions and <br />REV: 11-27-19 PR <br />ATTY/AGR.2019.295/Toole Design Group (Page 12 of 17) <br />
The URL can be used to link to this page
Your browser does not support the video tag.