My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt20 Toole Design Group
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2020
>
Under 60K
>
Agmt20 Toole Design Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2021 9:33:19 AM
Creation date
1/3/2020 4:47:08 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Toole Design Group
PROJECT NAME
Vera Ave Bicycle Blvd project management
RMP File Number
304.5
Date
1/2/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
neighborhood traffic circles). The plans shall consist of a plan view conceptual design of <br />the corridor, augmented by callout notes and pavement marking, signage, and traffic <br />calming details, as necessary. A general overview of proposed treatments that apply <br />consistently along the corridor (e.g., uniform enhanced crosswalk markings, speed <br />cushions, wayfinding) shall be included with sample images and locations for said <br />improvements. These concepts will be reviewed with the City during an in-person <br />meeting, and City comments will be incorporated into the next phase of design, 95% <br />design (Task 4). To develop the improvement concepts, consultant shall consider <br />innovative treatments that are considered state of the practice for creating safer and more <br />comfortable places for walking and biking. Typical bike boulevard treatments shall be <br />considered, including bicycle route signage and wayfinding; pavement markings; speed <br />humps,; intersection treatments such as traffic circles and curb extensions that can be <br />created using low-cost, removable materials; and bicycle and pedestrian treatments at <br />two larger intersections: Vera Avenue/Hudson Street, Vera Avenue/Upton Street. <br />All design treatments shall be implementable with materials that have some longevity, but <br />can be easily relocated or modified as necessary using high -impact, low-cost engineering <br />solutions (e.g., pavement markings, signs, flex posts, planters, Qwick Kurbs or armadillos, <br />signal timing modifications, etc.). <br />TASK 3 DELIVERABLES <br />15% concept design plans <br />TASK 4: DEVELOP 95% PLANS, SPECIFICATIONS AND ESTIMATES <br />After receiving comments on 15% concept design plans, consultant shall prepare 95% <br />design Plans, Specifications, and Estimates (PS&E). Consultant shall develop a summary <br />report that documents the design decision process, specifically how the latest standards <br />have been incorporated into the PS&E package, including design standards from <br />Redwood City, California MUTCD, and Caltrans Standard Plans. The submittal will <br />include the following: <br />Title sheet <br />• General notes and legend <br />• Right-of-way lines and existing conditions <br />• Proposed civil improvements (e.g., median islands, pedestrian ramps, etc.) <br />• Proposed signage and pavement markings <br />• Demolition Plan (if applicable) <br />• City and state standard details <br />Construction notes <br />• Specifications <br />• Draft construction quantity and cost estimates <br />• Construction schedule <br />REV: 11-27-19 PR <br />ATrY/AGR.2019.295/-roole Design Group (Page 13 of 17) <br />
The URL can be used to link to this page
Your browser does not support the video tag.