My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2020-02-24 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2020
>
AgdaPkt 2020-02-24 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 11:28:52 AM
Creation date
2/20/2020 5:56:17 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
2/20/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
433
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.A. - Page 19 of 41 _ <br />ARN't <br />■ Provide the choice of "convenience living" <br />■ Create the entertainment center of the Peninsula <br />■ Create a strong employment district and "vital center" <br />■ Make pedestrians a priority <br />■ Integrate transit and bicycle use <br />■ Provide 'just enough" parking and create a "park -once and walk" district <br />The redevelopment of Sequoia Station will allow the City to achieve these goals on a large, key site <br />in the Downtown Core of the DTPP. The development concept proposed meets the intent of the <br />Downtown Core, which "is intended to be a vibrant mixed-use residential neighborhood and office <br />district" (DTPP, Page 46). As the center, the Downtown Core is "where the majority of ground -level <br />shops are concentrated, and therefore where pedestrian activity is most lively and where the most <br />pedestrian amenities are located" (DTPP, Page 18). Per the DTPP, "the Downtown Core is the most <br />urban part of the Precise Plan Area; its streets will be shared equally by vehicles and pedestrians" <br />(DTPP, Page 18). The redevelopment of Sequoia Station would also serve as a catalyst to the <br />implementation of the 2017 EI Camino Real Corridor Plan and would jumpstart the intersection, <br />bicycle and pedestrian improvements envisioned for the area. Moreover, the redevelopment would <br />allow for the connection to transit envisioned under the EI Camino Real Corridor Plan, creating a <br />strong link between Downtown Redwood City and the surrounding neighborhoods. <br />The unparalleled location provides a unique opportunity to focus jobs and housing on transit and <br />accessibility not only on the site but also through potential land dedications to allow for future <br />Caltrain upgrades as envisioned in the CalTrain Business Plan 2040 Service Vision. Sequoia Station's <br />size, scale and location allows for the strategic placement of density on transit, while allowing for a <br />focus on non -automobile transportation modes and reduced parking ratios because of the site's <br />adjacency to transit and proximity to Downtown. This combination of attributes also allows for <br />seamless pedestrian connectivity to Downtown. <br />Sequoia Station ownership is now aligned and positioned for redevelopment. Redevelopment, <br />however, can only occur with a General Plan Amendment because of the existing DTPP <br />development caps that currently make redevelopment infeasible. A General Plan Amendment can <br />lift these caps and provide the opportunity to create the framework for a downtown transit and <br />transportation hub within an employment district. If the General Plan Amendment Initiation <br />request is granted by Council, a development application for Sequoia Station can be submitted. <br />Without a General Plan Amendment, Sequoia Station cannot be redeveloped and will remain in its <br />current state — an outdated, car -centric, neighborhood -serving commercial center. <br />11901 Harrison Street, Suite 1430, Oakland, California 94612 510.669.5882 www.lowe-re.com <br />213 <br />
The URL can be used to link to this page
Your browser does not support the video tag.