My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2020-11-09 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2020
>
AgdaPkt 2020-11-09 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2020 8:53:43 AM
Creation date
11/5/2020 6:29:34 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
11/9/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
883
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
From: ceasterbrook58 <br />To: CD -Lindy Chan <br />Cc: GRP -City Council <br />Subject: Public Hearing Comment for 11/09/2020 Council Meeting - South Main Mixed Use Project (Item 8.A.) <br />Date: Monday, November 9, 2020 2:27:31 PM <br />Lower Redwood Avenue residents expressed concern at earlier public hearings for the health <br />and safety risks associated with cut -through traffic expected to be generated by the South <br />Main Mixed Use Project. <br />At a community meeting held September 2, 2020, a traffic calming proposal for Redwood <br />Avenue (between El Camino Real and Hudson) was presented as sponsored by Greystar. <br />At the Transportation Advisory Committee on September 8, 2020, this proposal was <br />discussion Item B. The proposed design is as available for viewing on the City's website <br />11/09/2020. <br />At this time, I understand that Greystar (as represented by Jonathan Fearn) is committed to <br />making the Redwood Avenue improvements and that the City of Redwood City (as <br />represented by staff members Manzi and Chan) will memorialize the commitment as a <br />condition of approval for the South Main Mixed Use Project. <br />Most affected Redwood Avenue residents are appreciative of the City's and the Developer's <br />efforts, look forward to the construction of the improvements as soon as possible, desire <br />technical city staff s continued engagement to ensure the efficacy of traffic calming efforts, <br />and ask the City to consider the opportunity for a value added project by replacing greatly <br />deteriorated sidewalk/curb/gutter in the same area. <br />Staff has not clarified the current status of roadway projects proposed in the El Camino Real <br />Corridor Plan that potentially redirect and increase vehicular traffic on Redwood Avenue <br />between El Camino Real and Hudson. I remain adamantly opposed to any and all roadway <br />reconfigurations, including the extension of Main Street across El Camino Real and the <br />relocation of signal lights from Oak to Redwood, that may result in Redwood Avenue bearing <br />a disproportionate and disadvantageous amount of risk to health and safety from cut -through <br />vehicular traffic potentially generated by South Main Mixed Use Project. <br />Thank you very much for your time and attention, <br />W <br />1 Easterbrook <br />W" <br />Sent from my Galaxy Tab® A <br />
The URL can be used to link to this page
Your browser does not support the video tag.