My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2020-11-16 Special
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2020
>
AgdaPkt 2020-11-16 Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2020 10:54:32 AM
Creation date
11/12/2020 6:50:43 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Special
Agency Type
City Council
Date
11/16/2020
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
Created:
11/12/2020 6:53 PM
Modified:
11/12/2020 6:53 PM
Text:
http://www.redwoodcity.org/
ID:
2
Creator:
Created:
11/12/2020 6:53 PM
Modified:
11/12/2020 6:53 PM
Text:
https://rwcmoves.com/final-plan
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
820
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
S.A. - Page 9 of 302 <br />FIGURE 5 - OPEN SPACE <br />Bicycle & Pedestrian Facilities: The project would provide a combination of bicycle and pedestrian facilities <br />to improve circulation to those not traveling by automobile. Note that all work on EI Camino Real would <br />require approval from CalTrans since it is a state highway. These are described below: <br />• Install a new 10 ft. wide walkway (including trees, pedestrian lights, par -course fitness equipment, <br />and bike repair kiosk), along the southern side of Redwood Creek between EI Camino Real and <br />Lathrop streets. <br />• Install a new 8 ft. wide walkaway (including trees and pedestrian lights), along the western side of <br />the railroad tracks between Chestnut and Beech streets. <br />• Install a new protected bike lane on EI Camino Real (east side) between Cedar and Maple streets <br />consistent with the EI Camino Real Corridor Plan. <br />• Improve circulation by installing a new median on EI Camino Real to allow right turn in/out only <br />from Beech Street and install a new crosswalk with a HAWK signal to enhance safety when crossing <br />EI Camino Real. <br />• Improve circulation by reconfiguring Beech Street to align with Lincoln Street west of EI Camino <br />Real consistent with the EI Camino Real Corridor Plan. As noted above, this new intersection would <br />provide safer crossings. <br />• Improve circulation by removing the section of Shasta Street between Chestnut and Main streets, <br />allowing safer movements at the intersection. <br />• Install sidewalks (including street trees, pedestrian lights, and bike parking), bike lanes and green <br />infrastructure along EI Camino Real, Beech, Elm, Cedar, Lathrop, Main, and Jefferson streets within <br />the project site. <br />• Install traffic calming measures on Lathrop between Cedar and Maple streets to create a bicycle <br />boulevard consistent with the Citywide Transportation Plan (RWCmoves). Improvements include <br />Page 9 of 22 <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel: 650-780-7000 www.redwoodcity.ore <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.