My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res20 15907
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2020-2029
>
2020
>
Res20 15907
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2020 3:24:40 PM
Creation date
11/19/2020 3:23:59 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Special
Agency Type
City Council
Date
11/16/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
11/16/2020 <br />Impact CR -1: The project would result in a substantial adverse change in the <br />significance of a historical resource. <br />Impact CR -4: The project, combined with cumulative development, including past, <br />present, and reasonably foreseeable future development, could result in a significant <br />adverse cumulative cultural resources impact. <br />Through the environmental review process, the City identified the following five (5) <br />potential Project alternatives for consideration: <br />Alternative Location. Although initially considered as a potential Project alternative, <br />development of an alternative site was rejected as infeasible during the EIR scoping <br />process, because an alternative location has not been identified that would meet most <br />of the applicant's and City's project objectives, several of which are specific to the <br />project site and vicinity. It is uncertain whether an alternative location would reduce or <br />avoid any of the other impacts identified for the Project and the feasibility of obtaining <br />other similar sites. See DEIR page 5-3. Therefore, this alternative was not evaluated in <br />the EIR. <br />Reduced Office Alternative. An alternative that would have included development of <br />a reduced square footage of office uses was considered during the EIR scoping <br />process. This alternative was rejected because it would not provide a substantial <br />reduction or avoidance of significant impacts identified for the Project. In addition, a <br />reduction in office space would reduce the financial returns of the project and thus the <br />ability of the project to provide the community benefits (e.g., open space, childcare, <br />affordable housing). As a result, the Reduced Office Alternative would not achieve the <br />related project objectives for community benefits to the same degree as the Project. <br />See DEIR page 5-3. Therefore, this alternative was not evaluated in the EIR. <br />No Project Alternative. CEQA Guidelines Section 15126.6(e) requires that an EIR <br />analyze a "No Project" alternative. The purpose of describing and analyzing a no project <br />alternative is to allow decision -makers to compare the impacts of approving the project <br />with the impacts of not approving the project. The No Project Alternative was evaluated <br />in the DEIR (see DEIR pages 5-4 through 5-6). <br />Preservation Alternative. The Preservation Alternative would be constructed on the <br />same development parcels as the Project, and its development program would be <br />identical to that of the Project (i.e., same number of multi -family residential units, same <br />square footage of retail and office space, and same amount of public and private open <br />space). However, under the Preservation Alternative, Perry's Feed Shed would be <br />rehabilitated and repurposed for retail use; under the Project, this structure would <br />instead be demolished and a replacement structure accommodating retail use would <br />be constructed in its place. The Preservation Alternative was evaluated in the DEIR <br />(see DEIR pages 5-6 through 5-8). <br />2018 Project Alternative. The 2018 Project Alternative would develop 249 fewer <br />ATTY/RESO.0118/PC RESO SOUTH MAIN MIXED -USED PROJECT <br />REV: 11-03-2020 PR <br />Page 27 of 32 <br />RESO. NO. 15907 <br />MUFF NO. 601 <br />
The URL can be used to link to this page
Your browser does not support the video tag.