Laserfiche WebLink
approximately $3,061.00 per residential unit or the office equivalent (approximately <br />$1,548,511). Payment is due prior to the issuance of any building permits on Parcels A-E. <br />[MM RP][ENGINEERING] <br />10. Parks Impact Fee — Pay a Parks Impact Fee for the net new dwelling units resulting from the <br />proposed project, estimated at $5.14 million. [SDR][PARKS] <br />11. School Impact Fee — For residential additions greater than 500 square feet and new commercial or <br />industrial construction, pay a School Impact Fee to the Sequoia Union High School District. <br />Information regarding this fee may be obtained by contacting the Sequoia Union High School District <br />at (650) 369-1411. [SDR][SCHOOL DISTRICT] <br />12. Art in Public Places Fee — Commercial projects over 50,000 square feet or more may make a <br />contribution to the Art in Public Places Fund in -lieu of placing art on their project site. The in -lieu <br />fee must be equal to 1% of the construction valuation, or the difference between 1% of the <br />construction valuation and the value of art provided on-site. [COA][PARKS] <br />13. Water and Sewer Fees — Pay applicable water, recycled water, and wastewater -related fees as <br />outlined on the Cit 's website. [SDR][ENGINEERING] <br />14. Notice of Fees Protest — The applicant may protest any fees, dedications, reservations, or other <br />exactions imposed by the City as part of the approval or as a condition of approval of this <br />development. Per California Government Code Section 66020, this 90 -day protest period has begun <br />as of the date of the approval of this application. [SDR][OFFICE OF THE CITY ATTORNEY] <br />Landscaping and Site Improvements <br />15. Water -Efficient Landscaping — Provide a landscaping and irrigation plan conforming to the <br />California Water -Efficient Landscape Ordinance (AB 1881), including an automatic irrigation system <br />(drip, micro -spray, or bubblers) with a rain sensor, and show these measures on the building permit <br />plans. [COA][PLANNING] <br />16. Tree Survey - Provide a tree survey that identifies type, diameter at breast height (DBH), condition <br />and location prior to building permit issuance. [COA][PLANNING] <br />17. Tree Protection - Provide tree protection measures for ordinance -sized trees near the project and <br />show these measures on the building permit plans. [COA][PLANNING] <br />18. Tree Removal Permit - Obtain a Tree Removal Permit for the removal and tree trimming of all <br />ordinance -size trees (number, type and location) defined within the City's Tree Preservation <br />Ordinance prior to building permit issuance. [SDR][PLANNING] <br />19. Street Trees — Provide street trees along the street frontages as required below. The tree species <br />and location will be determined by the Community Development & Transportation Director, or its <br />designee. These improvements shall be included as part of the building permit submittal package. <br />Newly planted trees shall be both irrigated and maintained by the applicant. [SDR][PLANNING] <br />ATTY/RESO.0125/PC RESO SOUTH MAIN MIXED USE PROJECT—ENTITLEMENT RESO. NO. 15908 <br />REV: 11-03-2020 PR MUFF NO. 601 <br />Page 16 of 38 <br />