My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt20 SOLitude
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2020
>
Agmt20 SOLitude
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2025 10:32:34 AM
Creation date
1/21/2021 3:50:40 PM
Metadata
Fields
Template:
Agreement
Contractor Name
SOLitude
PROJECT NAME
Lagoon management
RMP File Number
304
Date
12/28/2020
MO Ref
MO 20-220
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
and Federal laws. All mechanical harvesters shall be cleaned prior to deployment <br />to reduce the risk of introducing new invasive species into the Lagoon. Contractor <br />shall notify City staff 24 hours prior to any planned deployment. City staff shall be <br />allowed to conduct a visual inspection of equipment prior to use. <br />e. Material Disposal. <br />Contractor shall be responsible for disposal of all debris, trash, plant and algae <br />material removed from the Lagoon, at the City's request. City may provide <br />temporary storage area for materials during work season. Disposal costs will be <br />reimbursed by weight with a percent mark-up as outlined in the fee schedule. All <br />plant material should be as dry as possible prior to disposal. Receipts and dump <br />tags will be required for reimbursement. All disposal requests shall be carried out <br />annually no later than October 31. <br />f. Chemical Applications. <br />Contractor shall follow the draft Lagoon Management Plan: Redwood Shores <br />Lagoon, July 2003 (http://www.redwoodcity.org/home/showdocument?id=1802), <br />and any updates to the Lagoon Management Plan thereof, to identify needs, set <br />schedules, notify and advise the City of recommended algaecide and herbicide <br />treatments as well as provide notification prior to treatments. Copper based <br />algaecides are prohibited from being used in the Redwood Shores Lagoon. <br />Contractor shall provide state licensed staff, equipment and chemicals to carry out <br />applications safely and pursuant to County, State and Federal laws and be able to <br />specify name(s) of the registered applicator(s) that will perform chemical <br />application activities. Applicators must possess a Qualified Applicator License or <br />Qualified Applicator Certificate. Contractor shall provide copies of licenses or <br />certificates for all applicators that will be applying chemicals under this project. <br />g. Bathymetry/Mapping Services. <br />Contractor shall provide bathymetric or mapping services as requested by the City. <br />h. Equipment. <br />Contractor shall provide an up-to-date list of equipment that will be available to the <br />project for the term of the agreement. A minimum of two (2) aquatic harvesters are <br />required to be available for the duration of the project to assist in aquatic weed and <br />algae removal. Contractor shall ensure that replacement equipment is readily <br />available at all times to meet the needs of the operation. <br />REV: 11-24-2020 MI <br />ATTY/AGR.2020.271/SOLitude Lake Management, LLC (Lagoon Management & Environmental Consulting Servi) (Page 13 of 15) <br />
The URL can be used to link to this page
Your browser does not support the video tag.