Laserfiche WebLink
<br />Mr. Peter Vorometsanti <br />May /4, 2009 <br />Page 2 <br /> <br />Modeling the ferry terminal dictates that TJKM create a special generator procedure In the model <br />at the T AZ for the proposed terminal site. Review and analysis of ferry ridership forecasts and <br />land-side vehicle access/occupancy/parking data provided by the Water Emergency Transit Agency, <br />and communication with City staff regarding the resulting peak hour trip generation assumptions <br />to be used In the model Is Included In this task. <br /> <br />TJKM proposes a fee of $42,750 to perform the expanded scope of work required to add these <br />major transit Infrastructure Improvements to the traffic model for the new General Plan <br />alternatives. In addition, TJKM anticipates that the following expanded tasks, whIch are also <br />beyond the scope of work and budget of our original contract, will be needed to provide the <br />modeling services the City requires for both the General Plan and Individual development traffic <br />studies: <br /> <br />Preparation of Transportation Network Assumptions for Cumulative Model <br />The Cumulative General Plan scenario wlll Include development of the DMB Redwood City <br />Saltworks (Saltworks) project. City staff has forwarded TJKM some documents submItted by the <br />applicant, which Include a "Saltworks Specific Plan Cumulative Project DescrlptlonU (one paragraph <br />of text), and the following materials (dated March 17, 2009): conceptual site plan, on-site roadway <br />cross-sections, and narratIve descriptions of various transportatIon network connections, services, <br />and trip reduction measures. City staff Is providIng the land use data by TAZ for Input to the <br />model. However, TJKM must stili perform significant revIew and analysis of the transportation <br />network Information provided to prepare the network assumptions and trIp reduction factors to <br />be used In the Cumulative model. TJKM wtll also create a special generator In the model at the <br />T AZ for the recreation field area proposed on the project site. These tasks are beyond the scope <br />of work In our original contract. <br /> <br />At this time, pending discussion with City staff to further define the transportation network <br />assumptions, estImating the scope and budget for th,s task Is difficult. TJKM proposes to perform <br />this particular task by charging our standard billIng rates on a tlme~and-materlals basis with a not- <br />to-exceed limit of $8,500 unless the City provides prior written authorization for any additional <br />charges. <br /> <br />ContInuing "On-Call" Model Support Services <br />We understand that the City Is likely to require use of the traffic model for future traffic Impact <br />studies of large development projects, as Is the case with the Stanford Campus Extension EIR study <br />that Hexagon Is currently perlormlng. Under our original contract, TJKM will provide a copy of <br />the traffic model to other parties with written authorization from the City. However, we <br />anticipate occasions when those partIes will request additional Information and support for the <br />model from TJKM similar to our recent Interactions wIth Hexagon regarding the Stanford project <br />as mentioned above, a level of support which was not Included In the scope of our original <br />contract. AddItionally, TJKM responses to detailed Inquiries or requests from City staff or <br />consultants that go beyond explanation or c1arlflcatlon of model assumptions and the forecasts <br />produced, such as those Involving queries or manipulatIon of model data flies or generation of new <br />data, are additional work outside our original scope. <br /> <br />TJKM proposes to provide this continuing flon-call" model support service as needed on a task <br />order basis. Before responding to any detailed Inquiry or request for model support, TJKM would <br />provide the City with an estimate of our anticipated charges, and we would proceed only rf the <br />City gives us approval. As an Initial budget for these on-call services to be Included In the <br />requested-contract amendment, TJKM suggests not-to-exceed limIt of $25,000. <br />