My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt08 Verde Design
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2008
>
Agmt08 Under $60K
>
Agmt08 Verde Design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2008 9:18:56 AM
Creation date
6/11/2008 9:15:50 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Verde Design
PROJECT NAME
Hoover Park Synthetic Turf Field Renovation
Date
6/6/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Mr. Brian Lee <br />City of Redwood City <br />May 1 2, 2008 <br />Page 4 <br /> <br />Project Timeline <br />For the purpose of this proposal, we propose the following timeline: <br /> <br />Project Start-up and Site Investigation: <br />Analysis & Design: <br />Design Development: <br />Construction Documentation: <br />95% submittal package: <br />Bid submittal package: <br /> <br />2 weeks <br />2 weeks <br />2 weeks <br /> <br />3 weeks <br />1 week <br /> <br />The above timeline does not include review times by the City. <br /> <br />Client Responsibilities <br />In order to complete the items described in Scope of Services above, we request the City to provide the <br />following information. <br /> <br />A. Guidelines and Requirements <br />1. City/County codes, ordinances, and policies <br />2. Development and maintenance practice guidelines <br />3. Division One Specifications <br /> <br />B. Project and Site Information <br />1. Geotechnical investigation and report to enable design of the synthetic turf base and drainage <br />improvements <br /> <br />Special Provisions <br />A. Without attempting to be all-inclusive and for purposes of clarity, the following items are specifically <br />not included in the Scope of Services: <br />1. Meetings other than those listed <br />2. Presentations to public bodies, other than those listed <br />3. Project design documentation or costing in addition to what is noted above <br />4. Engineering (electrical, structural, geotechnical, mechanical) <br />5. Topographic survey work <br />6. CEQA documents <br />7. DSA processing, meetings, or coordination <br />8. Permit processing or Fees associated with the project <br /> <br />B. Services will be diligently pursued and every reasonable effort will be made to meet the mutually <br />agreed upon schedule. If the completion of the services is delayed at any time in the progress of <br />the work undertaken in this Agreement by conditions beyond the control of the Consultant, <br />including, but not limited to, strikes, lockouts, labor disputes, or the inability of Client, their <br />consultants, utility companies, or jurisdictional agencies to provide required information, processing <br />or direction; the time of completion shall be extended during such period and Consultant shall be <br />held harmless from any and all claims arising out of such delay. <br /> <br />ProFessional Compensation <br />The fixed fee for the above services is based on the current hourly rate of the office as defined in the <br />attached Charge Rate Schedule. Verde Design respectfully requests the following fixed fee (including the <br />stated products and anticipated reimbursable expenses) for the services outlined in the Scope of Work. This <br />fee is based on the anticipated work effort that will be required to successfully complete this project. <br /> <br />c:\documents and settings\- \Iocal settings\temporary internet files\content.outlook\ 13hoa62k\rwc-hoover park 050908.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.