My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt08 Mark Thomas & Company, Inc
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2008
>
Agmt08 Under $60K
>
Agmt08 Mark Thomas & Company, Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2008 12:46:22 PM
Creation date
8/21/2008 12:46:20 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Mark Thomas & Company, Inc
PROJECT NAME
Engineering Services
Date
8/21/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Mr. Peter Vorametsanti <br /> <br />Page 2 of3 <br /> <br />June 16, 2008 <br /> <br />SCOPE OF PROPOSED SERVICES <br /> <br />Based on the above project understanding and assumptions, MTCo will provide the following <br />serVIces: <br /> <br />1) Management/ Administration/QC <br /> <br />. Actively manage the as-built incorporation and Microstation conversion process to <br />assure a quality product is produced. <br />. Coordinate with the city staff and complete contract processing. <br />. Perform quality control check on final product prior to submittal to Caltrans. <br /> <br />The estimated budget for this work is $2,304. <br /> <br />2) Coordinate with Subconsultants <br /> <br />. Contact sub consultants to coordinate as-built changes and obtain their final electronic <br />CAD files. <br />. Coordinate with subconsultants if there are problems with conversion of some of their <br />files to Microstation. <br />. A budget of up to $6,000 is included for direct work by the various subconsultants that <br />might be required as part of the process. The following sub consultants provided <br />portions ofthe plans directly to MTCo for inclusion in the final contract documents: <br />Fehr & Peers (electrical plans) <br />Kennedy-Jenks Consultants (sewer and water line relocation plans) <br />Sugimura & Associates (plant and irrigation removal plans) <br />Parikh Consultants (log-of-test-borings plans <br /> <br />The estimated budget for this work is $8,048. <br /> <br />3) Incorporate As-built Markups into CADD files <br /> <br />. Draft hand marked as-built changes from As-built Plan set received from Harris & <br />Associates into the original AutoCAD files. <br />. Approximately 32 plan sheets have hand marked changes. <br /> <br />The estimated budget for this work is $4,174. <br /> <br />4) Convert AutoCAD Plans to Microstation format <br /> <br />. Convert all final as-built plan sheets from AutoCAD to Microstation format. <br />. Clean up reformatted files to closely emulate the original AutoCAD hardcopy prints. <br />. Place "As-built Plan/Construction Completed (date) "stamp in each plan sheet with <br />completion date as agreed upon between the city and Caltrans. <br />. Place all as-built change information on Microstation Level 62 in accordance with <br />Caltrans requirements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.