Laserfiche WebLink
<br />78 <br />Page 25 <br /> <br />Table 5 - Major Findings for BEST <br /> <br />Cost ProDosal <br /> <br />. Based on BEST's cost proposal, the estimated collection rate impact would be 24.06% <br />higher than the approved and projected 2008 Allied collection services compensation <br />(see Table 11). <br /> <br />. Collection capital cost and start-up cost are significantly higher than the other three <br />proposers (see Table 8). <br /> <br />. Costs for the collection of the existing stackable crates and existing plant materials carts <br />have not been included in the proposal and are assumed to be the responsibility of the <br />current franchised collection company. <br /> <br />. Several costs are significantly lower than those proposed by Republic, but significantly <br />higher than those proposed by Allied and Norcal. <br /> <br />Environmental Enhancements <br />. The company is committed to using the highest percentage of biodiesel fuel available. <br />. The company will use hybrid vehicles for its route supervisors. <br /> <br />Additional Services/Benefits Offered. butNot Reauired <br /> <br />. The Hatcher property adjacent to Shoreway is being acquired by the company and <br />BEST is proposing to neQotiate use of the facility for the following activities: <br /> <br />o Staging area during Shoreway facility construction. <br /> <br />o Relocation of the Shoreway Buy Back Center and HHW facility <br /> <br />o Bale/recyclable material storage <br /> <br />o Additional office space <br /> <br />o Mixed Construction and Demolition debris, self haul, and/or green waste <br />processing <br /> <br />SBWMA Collection Services RFP <br />Selection Committee Report: <br />Evaluation and Scoring of Proposals <br /> <br />Page 14 of 31 <br />August 21. 200B <br />