My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2021.02.22 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2021
>
AgdaPkt 2021.02.22 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2021 4:51:32 PM
Creation date
2/18/2021 5:12:39 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
2/22/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
657
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.J. - Page 24 of 86 <br />o (1) Air valve actuator damper motors <br />o (0) Reheat Valve (Reuse Existing) <br />o (1) Pressure transducers <br />o (1) Discharge air temperature sensors <br />o (1) AirFi wireless LED zone sensor <br />Each zone will share: <br />o 120/24VAC Transformer (Reuse Existing) <br />Attachment B <br />Bidder's Initials <br />• Retrofit one [1] Boiler (TCP MZ2-1) with BACnet UC600 Controller (Programmable UC600 <br />BACnet DDC controller supplied by bidder) <br />• Retrofit [1] AHU-1 (PEM 1-1) with BACnet UC600 Controller (Programmable UC600 <br />BACnet DDC controller supplied by bidder) <br />• Retrofit [1] AHU-2 (PEM 1-2) with BACnet UC600 Controller (Programmable UC600 <br />BACnet DDC controller supplied by bidder) <br />• Retrofit [1] AC -1 (PEM 1-3) with BACnet UC600 Controller (Programmable UC600 BACnet <br />DDC controller supplied by bidder) <br />Retrofit [1] AC -2 (PEM 1-4) with BACnet UC600 Controller (Programmable UC600 BACnet <br />DDC controller supplied by bidder) <br />• Retrofit (5) TCP panels with BACnet UC600 programmable controllers (Reuse of end <br />devices, low voltage cable and panel backplane) <br />Additional Requirements: <br />• Bidder shall provide up to two (2) hours of operator training <br />• Custom computer generated 3D graphics shall be provided for the Building Automation <br />System scope above <br />• First year parts and labor warranty shall be included <br />• Project engineering, management, and technical labor to program, integrate and <br />commission the system shall be included in bid <br />• Applicable Sales and/or Use Taxes shall be included in bid <br />Existing Building Management System must integrate with the following systems by enabling <br />and disabling through Building Automation System (BAS) applications and feedback alarm <br />status to the BAS. <br />A. Term <br />Page 7 of 27 <br />442 <br />
The URL can be used to link to this page
Your browser does not support the video tag.