My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt09 RKH Civil and Transportation Engineering
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2009
>
Agmt09 Under 60k
>
Agmt09 RKH Civil and Transportation Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2009 1:24:32 PM
Creation date
2/17/2009 1:22:45 PM
Metadata
Fields
Template:
Agreement
Contractor Name
RKH
PROJECT NAME
Automatic Red Light Enforcement Systems
RMP File Number
304
Date
2/6/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Intersection Study.. Route 84 & Broadway.. Redwood City <br />Proposal for Traffic Engineering Services <br /> <br />Task 2 - Field Review. <br /> <br />RKH will conduct a field review of the intersection to identify driver behavior patterns. <br />The field review will cover two hours of peak traffic conditions and two hours of off-peak <br />conditions on an average weekday. The field review will focus on driver action to signal <br />phase changes, visibility of signal indications, and vehicle clearance times through the <br />intersection. <br /> <br />Task 3 - Identification and Evaluation of Possible Countermeasures. <br /> <br />RKH will identify and evaluate possible countermeasures to red light running: <br /> <br />A. Improving signal head visibility <br />B. Adding signal heads <br />C. Evaluate all-red interval <br />D. Evaluate yellow change interval timing <br />E. Advance warning signing <br />F. Advanced yellow flashing beacons <br />G. Traffic signal coordination <br />H. Additional advance detection <br /> <br />RKH will rely upon as-built traffic signal plans of the intersection provided by <br />Caltrans through CLIENT in the evaluation of possible countermeasures. RKH <br />will field verify the visible elements of the traffic signal. <br /> <br />Task 4 - Review of Signal Timing Plan With Caltrans Staff <br /> <br />RKH will evaluate the current signal timing plan provided by Caltrans through CLIENT <br />and will discuss possible modifications with Caltrans to improve vehicle clearance times <br />through the intersection. <br /> <br />Task 5 - Draft Report <br /> <br />RKH will prepare a draft report documenting the study fmdings with text and graphics <br />and will make recommendations in support of the ARLES. The report will be submitted <br />in Adobe pdf format electronically to CLIENT for review and comment. <br /> <br />Task 6 - Final Report <br /> <br />Upon receipt of written comments on the draft report, RKH will prepare the fmal report <br />addressing and responding to the comments. The fmal report will be submitted to <br />CLIENT electronically in Adobe pdf format. <br />2 <br /> <br />~.w-l+ <br />
The URL can be used to link to this page
Your browser does not support the video tag.