My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt09 BKF Engineers
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2009
>
Agmt09 Under 60k
>
Agmt09 BKF Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2009 8:33:30 AM
Creation date
4/7/2009 8:33:29 AM
Metadata
Fields
Template:
Agreement
Contractor Name
BKF Engineers
PROJECT NAME
Redwood Shores Levee Improvement
RMP File Number
304
Date
3/17/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I~ <br />II- <br />BkF <br /> <br />APPROACH <br /> <br />For the noted areas with deficiencies, BKF will determine approximate quantities. These <br />quantities will be used to establish Engineer's Opinion of Probable Construction costs to <br />compare the alternatives. Note that this third alternative will only be considered for the <br />levee that is in front of the library and will be the only alternative presented at this location. <br /> <br />Additional summaries for comparison of the alternatives will include listing the constraints <br />and adjacent impacts. <br /> <br />Deliverables: <br /> <br />A Draft Pre-Design Technical Memorandum will be provided to the City summarizing the <br />alternatives and the cost for each at the various repair locations. Exhibits. depicting the <br />cross section of each alternative will be included in the Report. Geotechnical findings and <br />recommendations will be included. <br /> <br />Task Id. <br /> <br />Final Pre-Design Report <br /> <br />One meeting will be held to discuss the Draft Pre-Design Report. City comments will be <br />incorporated into a Final Pre-Design Report that will be used as the basis for Plans and <br />Specifications. A preferred alternative will be established. <br /> <br />Deliverables: Drawing documenting the preferred alternative. <br /> <br />A Final Pre-Design Technical Memorandum will be provided to the City. The base plan <br />and profile drawings for the improvement sections <br /> <br />Task I - Geotechnical Services <br /> <br />Levee Repair Design Consultation and Analysis: <br /> <br />- Review existing subsurface information for areas requiring repair identified by the <br />design team <br />- Interface with BKF in selection of preferred alternatives <br />- Provide design criteria and mitigation alternatives for levee repair <br />- Provide slope stability and settlement analysis for proposed levee to be raised <br />- Prepare report summarizing our fmdings and recommendations <br /> <br />Task 2. Construction Documents <br /> <br />Task 2a. <br /> <br />Supplemental Survey <br /> <br />No additional project survey is proposed. The existing plans will be based on straight line <br />interpolation of the existing levee survey. The cross sectional information will be based on <br />the use of the nearest existing cross section survey points as typical for the length of the <br />repair area. <br /> <br />City of Redwood City - Redwood Shores Levee Improvements <br />Date: February 20,2009 <br /> <br />--- --650.482".63'0'0 <br />www.bkf.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.