Laserfiche WebLink
<br />I~ <br />II- <br />Bkf <br /> <br />APPROACH <br /> <br />Task 2b. <br /> <br />Preliminary Construction Documents <br /> <br />Preliminary construction documents will be prepared for the improvements to the levee. <br />We assume drawings will be at lOO-scale. The plans will utilize existing City standard <br />details as appropriate. Caltrans and "Green Book" standard details will be used where City <br />standard details are not appropriate. Technical specifications will be provided separately <br />from the plans, as appropriate. The City will prepare the general specifications and include <br />the technical specifications into one specification book. <br /> <br />Design review meetings are included for the 80% submittals. Construction cost updates <br />will be provided for this submittal. <br /> <br />Deliverables: <br /> <br />80% Plans, Specifications and Cost Estimates will be provided to the City. <br /> <br />Task 2c. <br /> <br />Incorporate City Comments and Provide 1000/0 Submittal <br /> <br />City comments will be incorporated into a 100% Submittal that includes Plans and an <br />Engineer's Opinion of Probable Construction Cost. Specifications will be included on the <br />plans as needed. <br /> <br />Deliverables: <br /> <br />Three (3) copies of Full Size 100% Plans. The Plans will also be provided in electronic <br />format as using the .PDF format. <br /> <br />Task 2d. <br /> <br />Assistance during Construction <br /> <br />Assistance will be provided during the construction process including shop drawing <br />review, response to RFI's, and one site visit to prepare the punch list. <br /> <br />Attendance at the preconstruction meeting is excluded. <br /> <br />Task 2 - Geotechnical Services <br /> <br />Consultation with project team during design phase: <br /> <br />- Provide consultation and attend project team meetings during design phase <br />- Provide review of construction documents <br /> <br />Task 3. Levee Crest Elevation As-Built <br /> <br />Task 3a. <br /> <br />As-built Drawing <br /> <br />A post-construction GPS survey of the levee will be provided to the City for certification <br />by others. At this time, we do not know the survey requirements for FEMA certification; <br /> <br />City of Redwood City - Redwood Shores Levee Improvements <br />Date: February 20, 2009 <br /> <br />650.482. 6300 <br />www.bkf.com <br />