My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt09 Waterworks Industries, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2009
>
Agmt09 Waterworks Industries, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2013 12:01:35 PM
Creation date
4/7/2009 10:44:07 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Waterworks Industries
PROJECT NAME
RW shores Lagoon Aquatic Plant Mgmt
RMP File Number
304
Date
4/6/2009
MO Ref
MO 09-052,
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'. <br /> <br />F) TRASH AND DEBRIS REMOVAL <br /> <br />The trash and debris will be removed as a function of the lagoon surveys as detailed above. If <br />the surveys observe material that needs to be addressed, Waterworks Industries staff will be <br />dispatched to the area of concern and will accumulate the material, dispose of it in the l~dfill <br />and prepare a report at to the amount and location of the debris removed. This report will be <br />submitted to Redwood City on a monthly basis. <br /> <br />G) EOUIPMENT <br /> <br />The following equipment will be dedicated to the Redwood Shores Lagoon Management Project. <br />The dedicated equipment is as follows: <br /> <br />A. I-Eight Foot Cutting Head Aquatic Harvester - Propane Powered. <br />B. 1- Tilt/Conveyer Trailer for Transport of Harvester and Vegetation. <br />C. 1-16' Fiberglass Chemical Application and Water Quality Monitoring boat. <br />D. I-Zodiac inflatable Chemical Application and Water Quality Monitoring boat for small <br />lagoons. <br />E. I-Argo Amphibious Unit, for access to all lagoons. <br />F. I-Honda Chemical Application Spray unit. <br />G. I-SGA 20 Gallon Reward Spray unit. <br />H. 1- International Tractor for Transport of Harvester and Vegetation. <br />1. l-YSI 8000 Dissolved Oxygen and Salinity Meter. <br /> <br />The above equipment list is dedicated to the project and the Harvester will be on site 24 hours a <br />day, except for repairs. The below listed equipment is to be considered a back up list for the <br />exclusive use by Redwood Shores. If any of the above listed equipment fails or Waterworks <br />Industries, Inc. is in need of additional equipment to proactively manage the Lagoon, the below <br />listed equipment will be transported to Redwood Shores within 24 hours. <br /> <br />A. I-Six Foot Cutting Head Aquatic Harvester - Propone Powered. <br />B. I-Conveyer Trailer for Transport of Harvester and Vegetation. <br />C. 1-16' Aluminum Chemical Application and Water Quality Monitoring boat. <br />D. I-Argo Amphibious Unit, for access to all lagoons. <br />E. 1- Honda Chemical Application Spray unit. <br />F. I-SGA 20 Gallon Reward Spray unit. <br />G. I-Chevrolet I-Ton for Transport of Harvester and Vegetation. <br />H. I-Taylor Dissolved Oxygen and Salinity Meter. <br /> <br />In addition to the above, Waterworks has an additional four (4) harvestors, two of which are also <br />propane powered and an Aquamog that can be utilized for additional work that may be needed <br />by Redwood City. <br /> <br />.d <br /> <br />15 of 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.