My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt09 Keyser Marston Associates, Inc
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2009
>
Agmt09 Keyser Marston Associates, Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2010 4:58:25 PM
Creation date
6/8/2009 12:41:43 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Keyser Marston Associates, Inc.
PROJECT NAME
Real Estate Advisory Services
Date
5/15/2009
Reso Ref
304
MO Ref
10-120
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Task 5: Analyze Annual Impacts on other City Funds <br /> <br />Typically a Gas Tax Fund or Road Fund is the only other City Fund that is impacted by new <br />development. Based on our meeting with City staff we will determine what other funds, if any, <br />will be impacted by the Project, and we will estimate the impacts on those funds as well. <br /> <br />Task 6: Discussion and Analysis of Potential Fiscal Impacts of Meeting the Housing Needs <br />Associated with the Project (Optional/Fee Included in Scope) <br /> <br />The Housing Needs Assessment will determine the number of residential units at varying levels <br />of affordabllity that will be needed to accommodate the new employees of the Project. <br /> <br />For the subject task, we will calculate both the likely feasibility/affordability gap that will need to <br />be funded by the City in order to develop the needed affordable units as well as an estimate of <br />the on-going net fiscal impacts of the needed residential development. To estimate the <br />magnitude of the feasibility/affordability gaps, KMA will prepare financial pro formas for <br />affordable rental developments as well as ownership projects. The fiscal costs associated with <br />developing housing to accommodate the Project's employees are indirect/induced costs <br />associated with the Project and will therefore be treated separately from the direct fiscal <br />impacts. <br /> <br />Task 7: Incorporate EIR Mitigations/Infrastructure Impacts <br /> <br />To the extent that the EIR identifies infrastructure needs generated by the Project and/or <br />mitigation measures, KMA will incorporate those impacts and costs into the analysis. KMA will <br />also make use of the available Engineering Report prepared by BKF for Stanford University, <br />dated October 24, 2008 as revised by City Engineering staff, to assist with the infrastructure <br />analysis. <br /> <br />Additionally, if a portion of the public improvements to be funded by Stanford will benefit the <br />larger community, then KMA will assess the net benefit of the improvements to Redwood City. <br />For example, if the EIR determines that the Project will have a significant adverse impact on <br />traffic and the solution is. establishing a street car route such as currently envisioned in the <br />General Plan Update that would connect the site to Downtown Redwood City and would serve <br />the larger community, KMA will evaluate the extent to which the improvements to be funded by <br />Stanford would mitigate the number of traffic trips to be generated by the Project and llbuy" <br />roadway capacity. <br /> <br />Product: Draft technical memorandum, featuring graphics and tables. Upon completion of all <br />tasks, the memorandum will be incorporated into a final report. <br /> <br />Keyser Marston Associates, Inc. <br />\\SMs1\wp\99\99900\900b-851 to 900\900b-865 Rev 3.1 C.09.doc <br /> <br />Page 4 <br />January 2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.