My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2009-07-13 clsd and jnt
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2009
>
AgdaPkt 2009-07-13 clsd and jnt
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2009 3:45:46 PM
Creation date
7/9/2009 3:08:48 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
7/13/2009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />6.1D <br />Page 34 <br /> <br />.":.. City of Redwood City <br /> <br />CuJtural Resources <br />In the course of grading and construction activities, it is possible that cultur.aland <br />archaeological resources may be unearthed. Basin Research will conduct a Class ill <br />p.edestriansurvey of the proposed project area and prepare a report identifying <br />methods, results, conClusions, and recommendations for the treatment of any resources <br />identified. If possible, Basin will make recommendations regarding the eligibility of any <br />identified sites for listing on the National Register of Historic Places. The Em will <br />address potential impacts and identify measures that will be required to mitigate <br />impacts should resources be found. <br /> <br />Geology, Soils, and Seismicity <br />MHA I RMT will be assisted by Treadwell and Rollo, a geoteclmical firm, in addressing <br />the potential geologic and seismic impacts of the project. Due to the steeply sloping <br />nature of the subject property, there will be issues regarding the safety and stability of <br />construction on these parcels. The EIRwiIl contain a peer review of the geotechnical <br />feasibility study submitted by the applicant, and an analysis of the potential geologic <br />and seismic impacts and the mitigation measures to reduce or avoid impacts. This scope <br />of work includes a site ,reconnaissance and review of aerial photographs, but does not <br />include drilling borings, laboratory testing, or other subsurface exploration, though such <br />services are available upon request. <br /> <br />Hydrol~gy and Water Quality <br /> <br />MHA I RMT will be assisted by Balance Hydrologies in addressing the potential water <br />quality and hydrology impacts of the project. Based on our current understanding of the <br />project, the potentially significant hydrologic issues that will need to he addressed in the <br />Initial Study and EIR include:: <br /> <br />Effects of constructing roads, driveways, and homes on steep slopes on post-project <br />storm runoff peak rates and volumes, and downstream channel.or storm drain <br />capacity (local flooding); <br /> <br />Effects of changes in storm runoff quantity on bank erosion and channel stability in <br />the seasonal channel and downstream reaches (hydromodification); <br /> <br />Effects of new impervious surfaces on groundwater recharge to the seasonal <br />channel and any associated riparian and/or wetland resources; and <br /> <br />Effects of development on the quality of surface runoff to receiving waters, and on <br />the quality of recharge to groundwater. <br /> <br />- <br /> <br />Alteration of drainage patterns, placing housing or strUctures within.a IOO-year flood <br />hazard, and inundation by seiche, tsunami, or mudflows do not appear at this time to be <br />issues of significant concert\. <br /> <br />Janllary 11/ 2008 <br />RMT <br /> <br />1.2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.