My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt09 BKF Engineers
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2009
>
Agmt09 BKF Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2009 9:49:22 AM
Creation date
9/8/2009 9:49:21 AM
Metadata
Fields
Template:
Agreement
Contractor Name
BKF Engineers
PROJECT NAME
San Carlos Airport Levee Project
RMP File Number
304
Date
9/1/2009
MO Ref
09-170
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.~~ <br />II- <br />Bkf <br /> <br />APPROACH <br /> <br />EXHIBIT A - SCOPE OF WORK <br /> <br />Redwood Shores - Levee Improvements <br />San Carlos Airport Seement <br /> <br />PROJECT UNDERSTANDING <br /> <br />Our understanding of the levee improvements is based on a meeting with the City and <br />County on 5/21/09 and 6/4/09. The levee surrounding the San Carlos airport varies in <br />elevation from about 9.5 to 12.0. A section in the southern portion of the airport is within <br />the "safety area". This section of the levee will be designed with a temporary measure <br />such as an inflatable bladder. The other sections of the levee outside the "safety area" will <br />be increased to meet FEMA requirements, based on recommendations from Moffatt & <br />Nichol. Overall limits of levee improvements, addressed in this proposal, are shown on the <br />attached exhibit. <br /> <br />SCOPE OF SERVICE <br /> <br />Task 1. Data Collection and Alternative Evaluations <br /> <br />Task 1a. <br /> <br />Coordination <br /> <br />BKF will attend one coordination meeting with City and County staff to discuss design <br />concepts and constraints. <br /> <br />BKF will coordinate with the City of Redwood City, City of San Carlos, County of San <br />Mateo, San Carlos Airport, the Airport's FAA consultant, and other consultants as needed. <br />We assume communication will be mainly via e-mail and telephone. Coordination will <br />include preparing exhibits, as needed, to convey design intent and gain consensus. <br /> <br />Task lb. <br /> <br />Data Collection <br /> <br />BKF will perform a site walk to review the constraints. <br /> <br />BKF will review the geotechnical report and recommendations from ENGEO. <br />No additional topographic survey is included as part of Task 1 b. <br /> <br />Task 1c. <br /> <br />Preparation and Evaluation of Alternatives <br /> <br />Based on design details and criteria from ENGEO, BKF will prepare exhibits representing <br />three different alternatives; (1) earth embankment berm, (2) earth embankment or AC <br />overlay for entire roadway width, and (3) CMU retaining wall. Improvement goals will be <br />to increase the height of the levees while taking into account future settlement. The <br />minimum levee crest elevation is assumed to be NA VD88 elevation 11.8. We anticipate <br />this increased height may be up to three feet. <br /> <br />City of Redwood City - Redwood Shores Levee Improvements - San Carlos Airport Segment <br />Date: July 16, 2009 <br /> <br />650.482. 6300 <br />www.bkf.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.