Laserfiche WebLink
• Schools' walk and bike and attendance data (for previous years) <br />• Contextual data for collision factors analysis: <br />— Number of lanes <br />— Presence of median or channelized right turns <br />— Presence of existing countermeasures <br />o Previous enhancements made to address collision issues <br />o Improvements made at location within period of safety data analyzed <br />— Signalized intersection variables <br />o Presence of traffic signal <br />o Signal phasing / presence of protected turns <br />o Pedestrian or bike signal equipment <br />o Leading pedestrian intervals or scramble phases <br />• Public safety and transportation enforcement activities <br />Task 2.2. Collect New Data <br />After reviewing the available data, Consultant and City staff will determine if the existing <br />data is adequate for the planning process or if additional new data needs to be collected. <br />The designated $2,500 budget for data collection may include count or utilization data for <br />facilities that have been constructed or modified since the completion of RWCmoves2. If <br />it is determined that the collection of new data is not required, this budget can be <br />reallocated to conduct field audits or complete optional tasks indicated in this scope. <br />DELIVERABLES: <br />• List of new/updated data necessary for the planning process <br />• New collected data if needed <br />Task 3- Existing Conditions Analysis <br />Consultant shall review the existing bicycle and pedestrian conditions in Redwood City by <br />utilizing the bicycle Level of Traffic Stress (LTS) evaluations, analyses of existing barriers <br />and pedestrian comfort, investigation of collision histories and trends, review of existing <br />programs and policies, and identification of equity and public health issues. Many of these <br />evaluations can be completed efficiently utilizing methodologies and algorithms developed <br />for the analysis completed as part of RWCmoves. <br />Task 3.1. Bicycle Level of Traffic Stress (LTS) Analysis <br />z Consultant developed the Citywide Transportation Plan (RWCmoves) in 2018. Therefore, all data and analyses is <br />available and could be used for this agreement. <br />REV: 03-04-21 PR <br />ATTY/AGR.2021.047/Fehr & Peers (Bicycle & Pedestrian Plan and Vision Zero Action P) (Page 14 of 31) <br />