My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt21 Kimley-Horn - Roosevelt Quick-build Traffic Calming Project PSE
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2021
>
Agmt21 Kimley-Horn - Roosevelt Quick-build Traffic Calming Project PSE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2021 9:48:02 AM
Creation date
6/17/2021 9:47:54 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Kimley-Horn and Associates, Inc.
PROJECT NAME
transportation planning and engineering firm
RMP File Number
304
Date
5/10/2021
MO Ref
21-061
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 04-08-2021 RL <br />Based on the 65% Design comments from City staff, Consultant shall prepare the 95% <br />design documents for the City’s review and comment. The plans will be based on the <br />latest City’s Engineering Standards, MUTCD, and Caltrans Standards. Consultant shall <br />revise the project’s specifications and opinion of probable cost for the 95% deliverable. <br />4.2. Quality Assurance and Quality Control <br />Consultant shall conduct quality assurance and quality control (QA/QC) at this phase of <br />the project. <br />Task 4 Deliverables: <br />One electronic copy of the final version of the 95% Design Plans (PDF format) <br />Two (2) hard copy sets of 95% PS&E Design Plans <br />95% Construction Cost Estimate <br />95% Specifications based on City’s updated manual <br />Summary Report for Design Process <br />Task 5 – Develop Final Plans, Specifications and Estimates (Final <br />PS&E) <br />After City review of the 95% PS&E package, Consultant shall provide written responses <br />to the City’s single set of consolidated, non-conflicting comments. Consultant shall attend <br />one meeting with the City to review comments and resolve any outstanding issues as <br />needed. <br />Based on the 95% design comments from City staff, Consultant shall advance to the Final <br />design documents for City review. Consultant shall revise the project’s specifications and <br />Opinion of Probable Cost for the Final deliverable and provide any justifications as <br />requested. <br />Consultant shall conduct quality assurance and quality control (QA/QC) at this phase of <br />the project. <br />Task 5 Deliverables: <br />One electronic copy of the final version of the Final Design Plans (PDF Format) <br />Two (2) hard copy sets of Final PS&E Design Plans in full size (24”x36”) <br />Two (2) hard copy sets of Final PS&E Design Plans in half size (11”x17”) <br />Final Opinion of Probable Cost and Specifications (PDF Format) <br />Project Base files in CAD (AutoCAD 2020 format) <br />ATTY/AGR.2021.075/Kimley-Horn (Roosevelt Quick-build Traffic Calming Project PS&E) (Page 14 of 17)
The URL can be used to link to this page
Your browser does not support the video tag.