Laserfiche WebLink
Proposed Work Program <br /> <br />June 2021 City of Redwood City / Gatekeeper Projects Subsequent EIR 3 <br />environmental science associates <br /> <br />Task 2: Prepare Administrative Draft SEIR <br />The project team will prepare the Administrative Draft of the SEIR in electronic form (Word and PDF). The <br />Administrative Draft SEIR will be prepared in accordance with current City guidelines. City staff will review the <br />Administrative Draft SEIR and provide ESA with one consolidated set of non-contradictory comments on the <br />SEIR. <br />The following discussion presents our approach to the SEIR and strategic considerations related to the <br />preparation and presentation of individual sections. <br />Introduction. The Introduction will briefly describe the CEQA process; the principal characteristics and objectives <br />of the proposed project, the City’s planning process and its relationship to the General Plan and DTPP, the <br />environmental review process, and the procedural steps by which the SEIR will be processed. <br />Summary Section. The Summary will describe the proposed project and alternatives, and will provide a <br />summary table that outline significant environmental effects, mitigation measures, and residual levels of impact <br />significance after mitigation, along with a brief narrative regarding principal areas of public controversy. <br />Impact Sections. Although all of the environmental considerations in the CEQA Guidelines Appendix G checklist <br />will be considered, for purposes of scoping, the SEIR is expected to address in detail the following <br />environmental topics, consistent in format with the DTPP Final EIR: <br /> Land Use and Planning <br /> Population and Housing <br /> Aesthetics and Shadows <br /> Cultural and Historic Resources (including Paleontological and Tribal Cultural Resources) <br /> Public Services (including Recreation) <br /> Transportation <br /> Utilities and Infrastructure (including Hydrology and Water Quality) <br /> Noise and Vibration <br /> Air Quality <br /> Climate Change (Greenhouse Gas Emissions, Energy and Sea Level Rise) <br /> Hazards and Hazardous Materials <br /> Biological Resources <br /> Geology and Soils <br /> <br />Each SEIR technical section will include an existing environmental setting, focusing on any changes in <br />environmental conditions which may have occurred since the DTPP EIR was prepared; and a regulatory setting <br />that will include any applicable changes to plans, policies and regulations. Consistent with the CEQA Guidelines <br />and case law, the DTPP as reviewed in the DTPP Final EIR would be treated as part of the baseline for <br />subsequent environmental review. The appropriate CEQA significance criteria for each topic in the SEIRs will be <br />developed in consultation with the City. <br />Each SEIR impact analysis will include any new supplemental impact findings, including impacts which may <br />have changed due to new information, changed circumstances, or proposed amendments to the DTPP to <br />accommodate the Gatekeeper Projects, and therefore, were not considered in the previous CEQA document; <br />and any supplemental mitigation recommendations to avoid or reduce impact changes or new impacts not <br />identified in the previous CEQA documents. <br />REV: 06-23-21 MI <br />ATTY/AGR.2021.150/Environmental Sciences Associates (Gatekeeper Projects) (Page 13 of 58)