My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt21 Environmental Science Associates
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2021
>
Agmt21 Environmental Science Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2021 8:56:10 AM
Creation date
8/17/2021 8:55:26 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Environmental Science Associates
PROJECT NAME
Agreement for Services (Gatekeeper)
RMP File Number
304
Date
6/28/2021
MO Ref
21-113
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
transportation network design modifications and/or TDM strategies to reduce the number and/or <br />length of vehicle trips. <br />In addition, Fehr & Peers will qualitatively assess CEQA transportation impacts based on the non-VMT <br />CEQA Guideline criteria that address whether the project would: <br />a) Conflict with a program, plan, ordinance, or policy addressing the circulation <br />system, including transit, roadway, bicycle, and pedestrian facilities <br />b) Substantially increase hazards due to a geometric design feature (e.g., sharp curves <br />or dangerous intersections) or incompatible uses (e.g., farm equipment) <br />c) Result in inadequate emergency access <br /> <br />Task 1.2 – Data for Air Quality and Noise Analysis <br />To support the air quality and noise analysis, we will develop base year and cumulative volumes from <br />the C/CAG model. Specifically, we will provide the following: <br />For Air Quality and Greenhouse Gas Emissions Analysis: <br />1. Average Daily Vehicle Trips associated with base year model land uses in Redwood City <br />2. VMT associated with base year land uses in the Redwood City <br />3. Average Daily Vehicle Trips associated with 2040 without Project and 2040 with Project land <br />uses in Redwood City (at the planning horizon) <br />4. VMT associated with the 2040 without Project and with Project land uses in Redwood City <br />For Noise Analysis <br />1. Daily Segment Traffic Volumes for base year for all segments analyzed <br />2. Daily Segment Traffic Volumes for 2040 without Project and 2040 GP Plan Year for all <br />segments analyzed <br />3. Speed limits on the segments for existing and future time frames, if available <br />This task assumes we will rely on C/CAG’s base year model outputs for existing conditions. <br />Task 2 – Local Transportation Analysis <br />The local transportation analysis will provide a balanced level of analysis for all modes of travel to <br />evaluate pedestrian, bicycle, transit, and vehicle circulation networks. The local transportation analysis <br />is conducted for City requirements outside of CEQA. <br />Our scope assumes that we will evaluate the project under Existing and Cumulative conditions without <br />and with the Project for the standard AM and PM commute peak periods. <br />Task 2-1: Trip Generation and Study Area <br />One of the first tasks is to establish the study area limits and identify the study intersections, freeway <br />segments, and freeway ramps using the trip generation and trip assignment for the Gateway project. <br />We will present the trip generation estimates for the project based on the final project descriptions <br />provided by the EIR consultant. <br />REV: 06-23-21 MI <br />ATTY/AGR.2021.150/Environmental Sciences Associates (Gatekeeper Projects) (Page 44 of 58)
The URL can be used to link to this page
Your browser does not support the video tag.