My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt09 Kleinfelder West, Inc
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2009
>
Agmt09 Under 60k
>
Agmt09 Kleinfelder West, Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2009 4:40:57 PM
Creation date
9/18/2009 4:26:29 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Kleinfelder West, Inc
PROJECT NAME
Agmt for Geotechnical Engineering Services (Kleinfelder West, Inc.)
Date
9/16/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Engineering Analysis <br /> <br />Following our subsurface explorations and laboratory testing, our engineers will analyze the <br />data gathered in order to provide recommendations for earthwork and asphalt design. We <br />will provide geotechnical design parameters for use in design of the utility replacements. <br /> <br />Report Preparation <br /> <br />Results of our subsurface explorations, laboratory testing, and engineering analyses will be <br />summarized in a draft report containing the following: <br /> <br />· A description of the proposed project <br /> <br />· A description of the surface and subsurface site conditions encountered during <br />our site reconnaissance and field explorations <br /> <br />· Bore and jack casing design recommendations. <br /> <br />· An appendix that will include a summary of the field investigation and laboratory <br />testing programs. <br /> <br />· A brief discussion of the corrosion potential of the near-surface soils <br />encountered during our field exploration based on laboratory corrosivity tests <br />performed (NOTE: Kleinfelder does not practice corrosion engineering and, <br />therefore, detailed analysis of corrosion test results is not included in this <br />proposal). <br /> <br />Upon receipt of review comments from the City of Redwood City, a final report will be <br />prepared. This proposal is based upon the incorporation of one cycle of review comments <br />into the final report. <br /> <br />The need for meetings is difficult to forecast and are not included in this proposal. If <br />meetings are necessary, they will be considered beyond the scope of services outlined <br />herein and will be billed on a time-and-materials basis. <br /> <br />Additional Services <br /> <br />Our geotechnical investigation is only a part of the geotechnical/materials testing services <br />that are necessary during design and construction of the project. Subsequent services that <br />we offer include: <br /> <br />· Review of the project plans and specifications. We recommend this task be <br />performed as a means of verifying the recommendations contained in our <br />geotechnical investigation report for the site are consistent with the requirements of <br />the project as actually designed. <br /> <br />· Construction observation and testing during site development should also be <br />provided by Kleinfelder as a continuation of our design services on this project. <br /> <br />To help the project proceed in an orderly manner and to protect the City of Redwood City's <br />investment in this project, we recommend Kleinfelder provide the services described above. <br /> <br />01201 PROP (SJ09P133) ct Page 4 of 7 <br />Copyright 2009 Kleinfelder <br /> <br />KLEINFELDER 2011 N. Capitol Avenue, San Jose, CA 95132 <br /> <br />August 21, 2009 <br /> <br />PhI408.586.7611 <br /> <br />FAXI408.586. 7688 <br />
The URL can be used to link to this page
Your browser does not support the video tag.