17060 P a g e | 13 <br />Proposal for Storm Drain Pump Station Improvements Projects <br />BRADFORD PUMP STATION <br />Specifications provided with the 60% design submittal will include a complete list of specifications for the project, <br />as well as key specifications. Specifications will be per 2004 Construction Specifications Institute (CSI) format <br />modified for compliance with City formatted standards as applicable. A completed application for electrical service <br />upgrades for the facility will also be provided at the 60% design level of completion. <br />A Preliminary Opinion of Probable Cost of Construction will also be provided, which will be presented in <br />spreadsheet form, organized to identify unit and lump sum costs as applicable, and identify quantities of materials <br />to be incorporated into the work. <br />Deliverables: <br />60% Drawings, Specifications, and Preliminary Opinion of Probable Cost of Construction: Five (5) 11”x17” <br />bound hardcopy drawing sets, five (5) bound hardcopy specification sets, and one (1) electronic Adobe <br />Acrobat (PDF) copy of each <br />Post-60% Submittal Technical Review Meeting & Comment/Response Log <br />Task 4.2 – Prepare 90% Plans, Specifications and Cost Estimate <br />The consultant team will develop 90-percent design documents. The 90-percent plans and specifications will <br />expand on the 60-percent submittal set to include all remaining design details for the project. All comments <br />received from the 60-percent submittal and Technical Review Meeting will be compiled and responded to in writing <br />and incorporated into the 90-percent submittal by the consultant team. The Opinion of Probable Cost of <br />Construction will be updated and submitted to reflect all work elements associated with the 90-percent design by <br />the consultant team. <br />Deliverables: <br />90% Drawings, Specifications, and updated Preliminary Opinion of Probable Cost of Construction: Five (5) <br />11”x17” bound hardcopy drawing sets, five (5) bound hardcopy specification sets, and one (1) electronic <br />Adobe Acrobat (PDF) copy of each <br />Post-90% Submittal Technical Review Meeting & Comment/Response Log <br />Task 4.3 – Prepare 100% (Final) Plans, Specifications and Cost Estimate <br />The 100-percent plans and specifications will be updated by the consultant team based on 90-percent design <br />submittal comments, and include all remaining details and notation required. All 90-percent submittal and <br />Technical Review Meeting comments received will be compiled and responded to in writing by the consultant team. <br />City General Engineering Standards and General Specifications documents, including bid proposal forms, contract <br />documents, and other pertinent documents will be included with the 100-percent (Final) specifications. The <br />Opinion of Probable Cost of Construction will be updated and submitted for the 100-percent (Final) design by the <br />consultant team. <br />Deliverables: <br />100% (Final) Drawings, Specifications, and 100% Draft Opinion of Probable Cost of Construction: Five (5) <br />11”x17” bound hardcopy drawing sets, five (5) bound hardcopy specification sets, and one (1) electronic <br />Adobe Acrobat (PDF) copy of each <br />100% Comment/Response Log <br />Task 4.4 – Conformed Set of Plans, Specifications, and Cost Estimates <br />The 100-percent plans and specifications will be updated based on addenda issued during the bidding phase and <br />compiled into one conformed set of plans and specifications for used during construction. <br />ATTY/AGR.2021.257/Wood Rodgers, Inc. (Bradford Storm Drain Pump Station Design) (Page 24 of 40)