My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt21 Wood Rodgers, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2021
>
Agmt21 Wood Rodgers, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2021 3:46:23 PM
Creation date
10/18/2021 3:45:27 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Wood Rogers, Inc.
PROJECT NAME
Bradford Storm Drain Pump Station Project
RMP File Number
304
Date
10/18/2021
MO Ref
21-180
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
17060 P a g e | 13 <br />Proposal for Storm Drain Pump Station Improvements Projects <br />BRADFORD PUMP STATION <br />Specifications provided with the 60% design submittal will include a complete list of specifications for the project, <br />as well as key specifications. Specifications will be per 2004 Construction Specifications Institute (CSI) format <br />modified for compliance with City formatted standards as applicable. A completed application for electrical service <br />upgrades for the facility will also be provided at the 60% design level of completion. <br />A Preliminary Opinion of Probable Cost of Construction will also be provided, which will be presented in <br />spreadsheet form, organized to identify unit and lump sum costs as applicable, and identify quantities of materials <br />to be incorporated into the work. <br />Deliverables: <br />60% Drawings, Specifications, and Preliminary Opinion of Probable Cost of Construction: Five (5) 11”x17” <br />bound hardcopy drawing sets, five (5) bound hardcopy specification sets, and one (1) electronic Adobe <br />Acrobat (PDF) copy of each <br />Post-60% Submittal Technical Review Meeting & Comment/Response Log <br />Task 4.2 – Prepare 90% Plans, Specifications and Cost Estimate <br />The consultant team will develop 90-percent design documents. The 90-percent plans and specifications will <br />expand on the 60-percent submittal set to include all remaining design details for the project. All comments <br />received from the 60-percent submittal and Technical Review Meeting will be compiled and responded to in writing <br />and incorporated into the 90-percent submittal by the consultant team. The Opinion of Probable Cost of <br />Construction will be updated and submitted to reflect all work elements associated with the 90-percent design by <br />the consultant team. <br />Deliverables: <br />90% Drawings, Specifications, and updated Preliminary Opinion of Probable Cost of Construction: Five (5) <br />11”x17” bound hardcopy drawing sets, five (5) bound hardcopy specification sets, and one (1) electronic <br />Adobe Acrobat (PDF) copy of each <br />Post-90% Submittal Technical Review Meeting & Comment/Response Log <br />Task 4.3 – Prepare 100% (Final) Plans, Specifications and Cost Estimate <br />The 100-percent plans and specifications will be updated by the consultant team based on 90-percent design <br />submittal comments, and include all remaining details and notation required. All 90-percent submittal and <br />Technical Review Meeting comments received will be compiled and responded to in writing by the consultant team. <br />City General Engineering Standards and General Specifications documents, including bid proposal forms, contract <br />documents, and other pertinent documents will be included with the 100-percent (Final) specifications. The <br />Opinion of Probable Cost of Construction will be updated and submitted for the 100-percent (Final) design by the <br />consultant team. <br />Deliverables: <br />100% (Final) Drawings, Specifications, and 100% Draft Opinion of Probable Cost of Construction: Five (5) <br />11”x17” bound hardcopy drawing sets, five (5) bound hardcopy specification sets, and one (1) electronic <br />Adobe Acrobat (PDF) copy of each <br />100% Comment/Response Log <br />Task 4.4 – Conformed Set of Plans, Specifications, and Cost Estimates <br />The 100-percent plans and specifications will be updated based on addenda issued during the bidding phase and <br />compiled into one conformed set of plans and specifications for used during construction. <br />ATTY/AGR.2021.257/Wood Rodgers, Inc. (Bradford Storm Drain Pump Station Design) (Page 24 of 40)
The URL can be used to link to this page
Your browser does not support the video tag.