Laserfiche WebLink
17060 P a g e | 14 <br />Proposal for Storm Drain Pump Station Improvements Projects <br />BRADFORD PUMP STATION <br />Deliverables: <br />Conformed Set of Drawings, Specifications, and Opinion of Probable Cost of Construction: Five (5) 11”x17” <br />bound hardcopy drawing sets, five (5) bound hardcopy specification sets, and one (1) electronic Adobe <br />Acrobat (PDF) copy of each <br />Task 4.5 – Record Drawings <br />The conformed plans will be updated by the consultant team based the Contractor’s as-built mark-ups, and RFI <br />response revisions issued during the construction phase for use by the City post-construction. <br />Deliverables: <br />Record Drawings: Five (5) 11”x17” bound hardcopy drawing sets, and one (1) electronic Adobe Acrobat <br />(PDF) copy <br />Task 5 – Storm Drain Pipe Improvements <br />The consultant team will design approximately 3,900 lineal feet of storm drain pipe located near the pump station. <br />The storm drain improvements are included to meet the HMGP grant requirements, obligations, and to qualify for <br />Phase 2 Construction funding from FEMA. All Task 5 deliverables such as survey maps, preliminary layouts, and bid <br />documents (plans, specifications, and cost estimate) will be submitted and tracked separately from the Bradford <br />Pump Station design tasks 1 through 4, and 6 through 8 by the consultant team. <br />Task 5.1 – Storm Drain Pipe Project Management <br />The Consultant will provide the kickoff meeting, project management and coordination necessary to design and bid <br />the storm drain pipe improvements. As shown on Exhibit 1, Project Schedule, the design phase is scheduled for 8 <br />months in duration with 100% final design by June 1, 2022. Design will be followed by a 45-day bid and contractor <br />selection phase, and construction occurring in the fall 2022 through winter of 2023. The Consultant will prepare <br />meeting notes and agendas for the meetings and will facilitate each of the meetings. <br />Design review meetings at the preliminary, 60%, 90%, and 100 % (Final) are included in Task 5.3 and Task 5.4. A pre- <br />bid meeting will be included in Task 5.5. <br />Deliverables: <br />Kickoff Meeting Minutes <br />Monthly Status Reports and Invoices <br />Project Coordination Meeting Minutes <br />Task 5.2 – Survey and Utility Locating <br />The consultant team will provide topographic surveying and mapping necessary for design of the storm drain pipe <br />improvements. The Consultant will review record drawings and utility information provided by the City for the pipe <br />locations. The City will also contact area utility companies for schematic information regarding underground utility <br />information within the location of the project site. The City will coordinate with the utility agencies for utility <br />relocation as required. The utilities locating subconsultant will provide utility locating and potholing as needed - <br />utility locating and potholing may be required and is included in this task. The collected data will be used for the <br />preparation of the project Base Maps. ROW will added be based on existing available information. <br />Deliverables: <br />Base Map including utilities: (1) Hard Copy and (1) electronic Adobe Acrobat (PDF) copy. <br />ATTY/AGR.2021.257/Wood Rodgers, Inc. (Bradford Storm Drain Pump Station Design) (Page 25 of 40)