My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt21 Wood Rodgers, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2021
>
Agmt21 Wood Rodgers, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2021 3:46:23 PM
Creation date
10/18/2021 3:45:27 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Wood Rogers, Inc.
PROJECT NAME
Bradford Storm Drain Pump Station Project
RMP File Number
304
Date
10/18/2021
MO Ref
21-180
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
17060 P a g e | 15 <br />Proposal for Storm Drain Pump Station Improvements Projects <br />BRADFORD PUMP STATION <br />Task 5.3 – Preliminary Design <br />The Consultant will lay out the proposed replacement pipes on the Base Maps developed in Task 5.3. The <br />Consultant will identify candidate reaches for parallel pipe construction as an alternative to pipe replacement. In <br />these candidate reaches; the selection will be made between replacing the pipe or constructing a parallel pipe <br />alongside it based on the approximate cost of replacement vs. parallel pipe. The selection will be documented on <br />the Base Maps. The reaches of pipe are presented in the table below. It is assumed that most reaches will require <br />pipe replacement because of the space constraints, and an alternative analysis will not be conducted. <br />Deliverables: <br />Base Maps with Preliminary Design: Five (5) hard-copies and one (1) electronic Adobe Acrobat (PDF) copy <br />will be provided for each Draft and Final submittal. <br />PROPOSED PIPE IMPROVEMENTS <br />Propose d <br />Rplcmnt <br />Pipe Pipe Length Stre et <br />(in dia)(in dia)(in dia)(lf) <br />48 54 30 660 El Camino <br />48 66 36 170 Cal i fornia to El Cami no <br />42 54 30 300 Bradford St <br />24 30 18 550 Alle rton St <br />30 33 18 350 Alle rton St <br />33 36 34 380 Winslow St <br />42 48 30 470 Marshall St <br />42 48 30 400 Mi ddlefie l d Rd <br />27 30 18 280 Spri ng St <br />24 30 18 370 Casi a St <br />3,930 <br />Alternate <br />Parallel <br />Existing <br />Pipe <br />ATTY/AGR.2021.257/Wood Rodgers, Inc. (Bradford Storm Drain Pump Station Design) (Page 26 of 40)
The URL can be used to link to this page
Your browser does not support the video tag.