Laserfiche WebLink
17060 P a g e | 16 <br />Proposal for Storm Drain Pump Station Improvements Projects <br />BRADFORD PUMP STATION <br />Figure 3 – Map of Proposed Bradford Watershed Storm Drain Pipe Improvements along Whipple Ave. & Veterans <br />Ave (See red piping within yellow circled areas) <br />Task 5.4 – 60, 90, 100 Plans, Specifications, Estimates <br />Design documents will be prepared by the consultant team at the 60%, 90%, 100% (Final) Design levels and <br />submitted to the City and any other approval agencies or stakeholder interests for review and comment. <br />Comments from all reviewing agencies will be addressed and responded to prior to the subsequent resubmittal by <br />the consultant team. A review meeting will be held with City after each submittal by the consultant team. Any <br />pertinent supporting calculations will be included with the submittals. All drawings and specifications will be <br />prepared in conformance with City CADD standards. <br />Standard precast or Caltrans standard details will be utilized for all manhole, junction boxes and hydraulic <br />structures, therefore specialized structural calculations and structural design by structural engineering are not <br />necessary. <br />The consultant team will develop 60-percent design documents building on the work of the Alternatives Analysis. <br />Drawings, key specifications, and a preliminary Opinion of Probable Cost of Construction will be included at the 60- <br />percent level of design. A list of all planned project drawings and specifications will also be provided with the 60% <br />design submittal. <br />The 60-percent drawings will include the following: <br />1. Title Sheet, Index, Location and Vicinity Map <br />2. General Notes, Abbreviations and Legend <br />3. Surveying Control <br />ATTY/AGR.2021.257/Wood Rodgers, Inc. (Bradford Storm Drain Pump Station Design) (Page 27 of 40)