My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt21 Wood Rodgers, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2021
>
Agmt21 Wood Rodgers, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2021 3:46:23 PM
Creation date
10/18/2021 3:45:27 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Wood Rogers, Inc.
PROJECT NAME
Bradford Storm Drain Pump Station Project
RMP File Number
304
Date
10/18/2021
MO Ref
21-180
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
17060 P a g e | 16 <br />Proposal for Storm Drain Pump Station Improvements Projects <br />BRADFORD PUMP STATION <br />Figure 3 – Map of Proposed Bradford Watershed Storm Drain Pipe Improvements along Whipple Ave. & Veterans <br />Ave (See red piping within yellow circled areas) <br />Task 5.4 – 60, 90, 100 Plans, Specifications, Estimates <br />Design documents will be prepared by the consultant team at the 60%, 90%, 100% (Final) Design levels and <br />submitted to the City and any other approval agencies or stakeholder interests for review and comment. <br />Comments from all reviewing agencies will be addressed and responded to prior to the subsequent resubmittal by <br />the consultant team. A review meeting will be held with City after each submittal by the consultant team. Any <br />pertinent supporting calculations will be included with the submittals. All drawings and specifications will be <br />prepared in conformance with City CADD standards. <br />Standard precast or Caltrans standard details will be utilized for all manhole, junction boxes and hydraulic <br />structures, therefore specialized structural calculations and structural design by structural engineering are not <br />necessary. <br />The consultant team will develop 60-percent design documents building on the work of the Alternatives Analysis. <br />Drawings, key specifications, and a preliminary Opinion of Probable Cost of Construction will be included at the 60- <br />percent level of design. A list of all planned project drawings and specifications will also be provided with the 60% <br />design submittal. <br />The 60-percent drawings will include the following: <br />1. Title Sheet, Index, Location and Vicinity Map <br />2. General Notes, Abbreviations and Legend <br />3. Surveying Control <br />ATTY/AGR.2021.257/Wood Rodgers, Inc. (Bradford Storm Drain Pump Station Design) (Page 27 of 40)
The URL can be used to link to this page
Your browser does not support the video tag.