Laserfiche WebLink
REV: 11-23-2021 <br />C. Post-Cleaning Inspection <br />Following the cleaning of the tanks, the Contractor shall provide a post-cleaning <br />inspection, noting new observations not previously recorded. Post-cleaning inspection <br />shall be considered a part of the scope of work in any tanks cleaned. No separate <br />payment shall be made for post-cleaning inspection. <br />D. Repairs <br />Contractor shall notify the Water Public Works Superintendent or their designee the same <br />business day after discovery of any structural damage that compromises the tank’s <br />performance or ability to retain water. <br />Should any areas be identified as needing minor repairs, the Contractor shall notify the <br />designated representative of the Redwood City Water Division and provide a cost to <br />complete the repairs. The City has the discretion to approve minor repairs while the <br />Contractor is on-site, or postpone repairs for a later date. <br />E. Report <br />Following evaluation, cleaning and minor repair, Contractor shall prepare a written report. <br />The report shall contain color photographs from both the interior and exterior surfaces. <br />The report shall contain detailed recommendations for any safety, sanitary, or <br />rehabilitation requirements along with estimated costs. <br />The Contractor shall supply one (1) printed copy of the report, one (1) electronic copy of <br />the report in PDF format, two (2) copies of photographs (in high-resolution JPEG format), <br />and videos shall be provided on USB flash drives. Electronic video files shall be playable <br />on native Windows 10 based applications and shall not require the installation of <br />proprietary software to be viewed. Alternatively, photographs taken may be provided on <br />two (2) copies of CD, and the video inspection of tanks may be provided as two (2) copies <br />of DVDs. <br />The Contractor shall provide copies of all aforementioned reports, photographs and <br />videos for each tank to Redwood City Public Works staff within 30 days of completion of <br />the cleaning, inspection and repair. All reports, photographs and videos shall become <br />property of the Redwood City Public Works Services Department. <br />F. Safety Plan <br />Work must be performed in accordance with the latest AWWA, CA State Water <br />Resources Control Board (SWRCB), and OSHA regulations. This shall include, but is not <br />limited to, OSHA standards for tank and confined spaces entry. Contractor is required to <br />submit a written safety plan to the designated representative of the Redwood City Water <br />Division prior to commencing any work. <br />G. Warning Signs and Barricades <br />If required, the Contractor shall provide suitable warning signs and barricades to protect <br />the public from injury due to its operations or presence of its equipment on or near the <br />site of work. <br />ATTY/AGR.2021.301/H2O Solutions, L.L.C. (Water Tank Inspection, Cleaning & Repair Services) (Page 13 of 18)