REV: 11-23-2021 <br />H. Schedule of Work and Time for Completion <br />The Contractor shall consult with the designated representative of the Redwood City <br />Water Division in planning its work schedule to make sure the Redwood City Water <br />Division is ready to proceed. Work shall be scheduled no less than two weeks in advance. <br />All work shall be performed during Redwood City’s Public Works work schedule of <br />Monday through Friday 8 am to 4 pm. For tanks scheduled for FY 2021-22, work shall <br />be scheduled and completed within the fiscal year by March 2022. If the agreement is <br />extended for an additional term per Section 3 (Term) of the agreement, for all other tanks, <br />work shall be scheduled and completed within the fiscal year indicated under this Scope <br />of Services for each tank between the months of July and September, 2022. <br />I. Protection of Adjacent Property <br />Structures adjacent to property shall be protected. The City shall not be responsible for <br />any damages caused by Contractor. <br />J. Storm Water Pollution Prevention <br />Contractor shall at all times comply with storm water pollution prevention practices for <br />potable water discharges and implement best management practices (BMPs) for <br />dechlorination, erosion and sediment control, and monitoring per the California Statewide <br />General Permit for Drinking Water System Discharges to waters of the United States. The <br />Contractor shall report to the City the total volume of water discharged in gallons for each <br />separate event. An event shall be considered to be the total volume discharges from an <br />individual water tank or reservoir per calendar day. The Contractor shall be responsible <br />for monitoring chlorine residual, turbidity, and pH downstream of the implemented BMPs <br />to measure their effectiveness, and submit the results to the designated representative of <br />the Redwood City Water Division in its Event Monitoring Log (incorporated herein as <br />Exhibit “B”). For reference a copy of the City’s Standard Operating Procedures Guide for <br />Potable Water Discharges may be provided to the Contractor upon request. <br />K. Stockpiling of Equipment and Material <br />The Contractor shall make all necessary arrangements for securing adequate and proper <br />places for storing materials and equipment. The Contractor shall obtain permission for <br />use of Public Works Services (PWS) from designated representative of the Redwood City <br />Water Division property before storing materials. PWS has limited space available in the <br />corporation yard. <br />L. Cleanup <br />Upon completion of each portion of the work, the site shall be cleaned of all debris and <br />equipment and shall be left in a neat condition to the satisfaction of the designated <br />representative of the Redwood City Water Division. <br />ATTY/AGR.2021.301/H2O Solutions, L.L.C. (Water Tank Inspection, Cleaning & Repair Services) (Page 14 of 18)