My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt22 BKF Sanitary Sewer Pump Station
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2022
>
Agmt22 BKF Sanitary Sewer Pump Station
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2025 2:52:50 PM
Creation date
3/25/2022 10:24:31 AM
Metadata
Fields
Template:
Agreement
Contractor Name
BKF Engineers
PROJECT NAME
Sanitary Sewer Pump Station Design Project
RMP File Number
304
Date
1/20/2022
MO Ref
22-002
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 12-22-21 JB <br />4)Similar to Pump Station No. 8, Consultant will replace existing forcemain in its <br />current horizontal/vertical alignment. Consultant will use as-built record profile (if <br />available) or use a straight line profile between proposed flow meter and <br />downstream gravity manhole to which the forcemain currently discharges to. If City <br />desires to locate all bends in the forcemain and utilities crossing the forcemain <br />between flow meter and discharge manhole, it will be necessary to pothole which <br />can be provided as additional service. <br />5)In the absence of as-built records and potholes, Consultant will prepare <br />specifications to require contractor to pothole forcemain to confirm <br />alignment/profile and add allowance for additional fittings/bends in existing <br />alignment/profile to avoid change orders. Consultant will also prepare bid <br />alternative for pipe bursting forcemain to allow replacement within easement on <br />residential lots. It is assumed that City will coordinate with individual property <br />owners for access and construction, as needed, and is therefore excluded from <br />the scope. <br />D. TIME SCHEDULE <br />The following is the consultant’s summary of the work schedule for the project. <br />Task Name Start Finish <br />Notice to Proceed 1/11/22 1/11/22 <br />Surveying and Utility Research 1/12/22 1/27/22 <br />Basis of Design Submittal 1/17/22 2/18/22 <br />60% Design Submittal 2/21/22 4/4/22 <br />90% Design Submittal 4/5/22 5/10/22 <br />100% Design Submittal 5/11/22 5/30/22 <br />Bid Support and Construction Services 6/14/22 1/23/23 <br />The Consultant’s detailed presentation of their project work schedule is shown on Exhibit <br />B. <br />E. COMPENSATION <br />Consultant shall perform the Scope of Work described for a not-to-exceed amount of Two <br />Hundred Ninety-Seven Thousand Nine Hundred and Thirteen Dollars ($297,913.00). <br />Consultant shall be compensated per hourly rates (Exhibit C) for work accomplished at <br />the end of the month payable within thirty (30) days following City’s receipt of satisfactorily <br />completed deliverables. <br />Consultant’s detailed breakdown of their level of effort and fees are shown on Exhibit C. <br />ATTY/AGR.2021.331/BKF Engineers (Sanitary Sewer Pump Station No. 8 and No. 9 Design) (Page 20 of 23)
The URL can be used to link to this page
Your browser does not support the video tag.