My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt22 Optony Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2022
>
Under $ 100K
>
Agmt22 Optony Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2022 10:36:23 AM
Creation date
4/22/2022 10:36:15 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Optony Inc.
PROJECT NAME
FS 9 Solar Feasibility study and project development and procurement services
RMP File Number
304.5
Date
4/21/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 04-07-2022 RL <br />• Evaluate potential interconnection options. This includes identification and preliminary <br />cost estimation for any required electrical equipment, and potential upgrade costs <br />Task 1.3. Operational Modeling. <br />• Estimate monthly production of energy delivered to electric grid that accounts for any <br />site-specific attributes that would affect onsite generation <br />• Identify and evaluate permitting requirements, costs, and any required facility upgrades <br />or other costs to obtain necessary permits <br />• Determine system sizing and associated validation of required space and capability to <br />connect to facility electrical panel, along with identification and pricing of any required site <br />electrical or other upgrades to support equipment <br />Task 1.4. Financial Modeling. <br />• Evaluate eligibility of proposed system to qualify for Solar Investment Tax Credit, Self- <br />Generation Incentive Program, and other applicable incentives and quantify expected <br />incentives <br />• Estimate financial revenues for considered system over the course of equipment lifetime <br />Task 1.5. Feasibility Study. <br /> • Develop feasibility study which will include energy cost savings and other benefits to <br />the City and different financing options available for the system with a projected cash flow <br />model including capital and on-going cost avoidance. <br />Phase 2 Key Activities: <br />Task 2.1. Request for Proposals (RFP) Development. <br />• Develop a RFP to solicit proposals from prospective vendors to deploy specified Project, <br />which will include drawings, diagrams, notes, and report(s) that characterize the proposed <br />system deployment and provide sufficient information for a vendor to provide a high <br />confidence bid on the project <br />Task 2.2. RFP Evaluation <br />• Assist City in technical evaluation of vendor proposals in response to competitive <br />solicitation <br />• Recommend oversight activities for Phase 3, including but not limited to design review, <br />permitting, utility interconnection, building commissioning, systems inspections, and <br />resolution of technical issues <br />Phase 3 Key Activities: <br />• Conduct periodic oversight activities as determined in Phase 2 at the direction of <br />Facilities Superintendent or designee to ensure Project is deployed and functions as <br />specified, including but not limited to design review, permitting, utility interconnection, <br />building commissioning, systems inspections, and resolution of technical issues <br />• Work with City and vendor as necessary in the resolution of any technical problems that <br />arise during deployment <br />ATTY/AGR.2022.070/Optony Inc. (Page 12 of 14)
The URL can be used to link to this page
Your browser does not support the video tag.