My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt22 Dewey Services, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2022
>
Agmt22 Dewey Services, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2023 3:19:17 PM
Creation date
7/19/2022 4:27:17 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Dewey Services, Inc.
PROJECT NAME
Vector Control Services
RMP File Number
304.5
Date
7/12/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 05-31-22 MI <br />J.Records of Work To Be Submitted <br />The Contractor will maintain a written record (made in the field at time of work <br />performed) of the items listed below. Records must be submitted to <br />SMCMVCD on the original field maps along with the Contractor’s work <br />summary sheet within two (2) working days after completion of each phase <br />of work, prior to billing. <br />If the inspection of a manhole or bait station is prevented (e.g. a paved over <br />manhole, flooding, tight manhole cover, etc.), the cause must be recorded. <br />The Contractor must inform the Public Works Director or designee and <br />SMCMVCD of this condition immediately and request their assistance to <br />remedy the situation so that the bait in the manhole may be inspected. <br />It is absolutely essential for the Contractor to keep an accurate record of all <br />pest activity (rodents and cockroaches). All evidence of rodent (gnawing on <br />the bait or rodent droppings) and/or cockroach activity found during the <br />inspection must be recorded on the field map and work summary sheet. <br />K.Required Data <br />i.Phase of work and dates performed <br />ii.Number of bait blocks/stations/manholes installed/sprayed with <br />the location of each designated on the maps provided <br />iii.Number of bait blocks/stations/manholes inspected and <br />accompanying field notes (e.g. percent consumption noted for each <br />block) <br />iv.Number of bait replacements / manhole resprays <br />v.Number of bait blocks/stations missing <br />vi.Number of bait blocks/stations re-installed <br />vii.(For Creek Program only) Number of bait stations removed in <br />October <br />L.Correction of Deficiencies <br />SMCMVCD will inspect each phase of work upon receipt of the Contractor’s <br />records (field maps and Contractor’s work summary sheet). In some <br />instances, every bait station will be checked or a portion of the stations will be <br />selected at random. Should any portion of the work not comply with these <br />specifications, the entire phase of work will be rejected by SMCMVCD until it <br />is corrected. <br />Therefore, it would benefit the Contractor should Contractor be notified by <br />SMCMVCD that certain deficiencies need correcting, to re-inspect the <br />identified deficiencies and expeditiously correct all deficiencies to insure that <br />no deficiencies exist. <br />During this re-inspection, to be made at the Contractor’s own expense, the <br />Contractor will be required to re-spray the pre-existing markings with blue <br />enamel paint to facilitate inspection of the Contractor’s re-inspection of all <br />ATTY/AGR.2022.127/Vector Pest Control (Dewey Services, Inc.) (Page 13 of 24)
The URL can be used to link to this page
Your browser does not support the video tag.