Laserfiche WebLink
Subtask F.2.1: 95% PS&E <br />Consultant will prepare and submit 95% construction documents for building permit <br />review. Comments from the City will be incorporated into the 100% PS&E bid set. <br />Deliverables: <br />• 95% PS&E package <br />• Submittal for City building permit review <br />■ Provide native files <br />Subtask F.3: 100% PS&E/Bid Set <br />Consultant will submit 100% construction documents for final City review. Comments, if <br />any, will be incorporated into plans to become the bid set. <br />Deliverables: <br />■ 100% PS&E package/bid set <br />• Submittal for City building permit <br />■ Provide native files <br />Subtask FA: Bidding Assistance <br />Consultant will provide up to eighteen hours of support to the City during the bidding <br />process by responding to bidder questions and pre-bid substitution requests forwarded <br />by the City and issuing addenda as deemed necessary and reasonable by the City to <br />clarify design related issues. <br />Deliverables.- <br />Up <br />eliverables:Up to eighteen (18) hours to respond to bidder questions, pre-bid substitution request <br />review, and addenda <br />Subtask F.S: Drainage Study and Stormwater Management Plan (Regulated Project) <br />Consultant will perform drainage analyses (hydrology and hydraulics) for the project <br />drainage and stormwater design. The findings and recommendations will be provided in <br />a comprehensive drainage study and stormwater management plan. A draft submittal <br />will occur at the 65% design level and a final submittal will occur at the 100% design level. <br />Analysis will occur for both on-site and off-site conditions. Off-site conditions will evaluate <br />for green infrastructure opportunities using the C.3d sizing criteria of the current NPDES <br />standards for the tributary area along the property frontage to determine if green <br />infrastructure is feasible and the on-site conditions will consider the City's design <br />standards of commercial drainage guidelines. Consultant will identify 100 -year design <br />hydrology (via Rational Method) and hydraulics (via Autodesk Hydraflow Storm Sewers <br />software utilizing the Manning's Equation) to design the proposed storm drain system in <br />accordance with City Design Criteria Volume III Part V: Storm Drain Design <br />Criteria. Hydraulic design will assume gravity pipe flow (i.e., no pumps). <br />Stormwater design for NPDES compliance will not be dependent on the amount of new <br />and replaced impervious surface per the C.3 Regulated Projects Guide (Version 1.0, <br />dated January 2020). This project is assumed a "C.3 regulated project" (i.e., project <br />REV: 08-04-2021 RL <br />ATTY/AGR 2021 207/RRM (Downtown Parks and Bay Connectivity Project) (Page 21 of 32) <br />