My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt22 HF&H Consultants,LLC
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2022
>
Agmt22 HF&H Consultants,LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 4:07:10 PM
Creation date
9/22/2022 12:07:53 PM
Metadata
Fields
Template:
Agreement
Contractor Name
HF&H Consultants,LLC
PROJECT NAME
Water and sewer rate and fee study
RMP File Number
304
Date
9/15/2022
MO Ref
22-153
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 08-25-2022 RL <br />Presentation to Utilities Sub-Committee <br />Using a City template, Consultant shall prepare a PowerPoint presentation of their <br />findings and recommendations for a fee workshop with the City’s Utilities Sub-Committee, <br />for review by the Public Works Director or their designee(s) at least two months prior to <br />the planned mailing date of the public hearing notice. Consultant shall incorporate any <br />feedback from City staff prior to presentation of the final slides to the Utilities Sub- <br />Committee during a meeting in Q1 of 2023. Consultant may present the slides to the <br />committee and either via video conference and/or in-person, as determined by the Public <br />Works Director or their designee(s). <br />Public Hearing Notice <br />At least six weeks prior to the planned dating of mailing, Consultant shall draft a public <br />hearing notice. Consultant shall incorporate any feedback after the review of the Public <br />Works Director or their designee(s) and submit a final notice to the Public Works Director <br />or their designee(s) two weeks prior to the planned date of mailing. One public hearing <br />notice will be mailed for both water and sewer utilities fees. <br />Draft and Final Reports <br />At least two months prior to the planned mailing date of the public hearing notice, <br />Consultant shall document the results of their analysis in a Draft Report, which shall be <br />provided for review in Word and/or Excel file formats to the Public Works Director or their <br />designee(s). The documentation shall explain their cost model, methodology, any fee <br />adjustments, and other assumptions. Consultant shall revise the Draft Report accordingly, <br />based on input from City staff and the Utilities Sub-Committee, and a Final Report will be <br />published in a PDF file format. The Final Report shall be finalized by the Consultant prior <br />to the mailing of the public hearing notice. <br />Implementation <br />Consultant shall conduct two fee workshops with City staff to present their findings and <br />recommendations, which may be either via video conference and/or in-person, as <br />determined by the Public Works Director or their designee(s). The presentation shall <br />include charts (or similar visual) where appropriate, such as a fee comparison with other <br />cities and graphic detailing the breakdown of revenue required by type (operating costs, <br />capital improvements, etc.). A final presentation shall incorporate any responses to <br />comments and questions from the Public Works Director or their designee(s). <br />Consultant shall revise (if necessary) the presentation made to the Utilities Sub- <br />Committee to present final findings and recommendations to the City Council. The final <br />presentation shall be finalized by the Consultant prior to the mailing of the public hearing <br />notice. Consultant shall be available to attend the public hearing either via video <br />conference or in-person, as determined by the Public Works Director or their designee(s), <br />at the end of the 45-day protest period to answer questions and request the adoption of <br />the proposed fee adjustments. <br />Municipal Code Review <br />ATTY/AGR.2022.318/HF&H Consultants, LLC (Page 24 of 27)
The URL can be used to link to this page
Your browser does not support the video tag.