Laserfiche WebLink
REV: 10-11-2022 RL <br />o Using compiled records together with field observed surface evidence to <br />prepare a subsurface utility base map drawing, and incorporate the information <br />into the topographic survey to be used for the master plan. <br /> Provide native files <br />Subtask 1.5: Conduct Preliminary Geotechnical Investigation & Report Preparation <br />The geotechnical scope of work will be focused on providing recommendations to help <br />support the designs of several important components of the master plan such as the <br />splash pad, learning pool, the parking lot, pedestrian pathways, restroom pads, and <br />plazas, as well as playground drainage. <br />Deliverables: <br />Completion of six to eight hand auger borings up-to depths of 5-10 feet <br />consisting of dynamic cone penetrometers to obtain tube samples. <br />Delivery of the samples to the laboratory for testing. <br />Performing visual soil classification on all samples. <br />Testing for moisture content, dry density, expansion potential, compression, <br />corrosivity, R-values, and landscape suitability. <br />Provide report to City <br />Subtask 1.6: Preparation of Opportunities and Constraints Maps <br />Using the information collected in the above tasks, Consultant will prepare diagrams <br />identifying key opportunities and/or site characteristics. These diagrams may encourage <br />use types, as well as constraints or characteristics that may limit or restrict use. They will <br />also identify elements that might be both opportunities and constraints and clearly <br />delineate trade-offs between competing interests. <br />Deliverables: <br />Provide diagrams/maps of space based on criteria above <br />Provide native files. <br />Subtask 1.7: Review and Evaluate Options for Site Plan and Placement of Amenities <br />Coordinate meeting with City to discuss site planning options. <br />Deliverables <br />1 week lead time or meeting <br />Provide all relevant documents 1 week prior <br />Subtask 1.8: Preparation of Meeting Minutes and Project Schedule <br />Consultant will hold in person meetings or conference calls or zoom meetings with City <br />staff on a regular basis during all phases of work. Consultant will provide ongoing <br />maintenance of project schedule and communications file. <br />Deliverables: <br />Provide weekly check in meeting to keep timeline on track <br />Email coordination with Client team throughout the course of the initial contract <br />Project schedule maintenance – monthly updates till complete <br />Internal management of the consulting team <br />ATTY/AGR.2022.233/O'Dell Engineering (Hoover Park Master Plan) (Page 13 of 22)