Laserfiche WebLink
REV: 10-11-2022 RL <br />o Diagrams <br />o Technical appendices for key components <br />Provide native files <br />Assumptions: <br />Existing utility connections in the City ROW are adequately sized to accept the proposed project <br />(no new service meters) <br />Proposed sewer and water utilities are for proposed restroom and/or drinking fountains <br />Any proposed restroom will be a prefabricated or manufactured product (i.e., no custom <br />restroom) <br />Structural elements are limited to footings for ornamental elements (arbor, signs pergola, trellis, <br />arch, shade structure) <br />Pavement design will assume City Standard Details, Caltrans Standard Plans, and any City- <br />provided geotechnical recommendations <br />Project will not require Fire Code updates (i.e., existing parking lots, roads, and fire hydrants <br />adjacent to the public) <br />Subtask 3.3: Prepare Dimensioned Site Plans, Elevations, and Colored Renderings to be <br />used as the Basis for Future Construction Documents <br />Consultant will prepare dimensioned site plans including elevations and color renderings <br />for improvements for the park site, including hardscape and landscape features, <br />amenities, electrical, plumbing, moving of items and other related infrastructure <br />improvements. <br />Deliverables: <br />Dimensioned site plans <br />Elevations plan <br />Traffic/Parking/Circulation plan <br />Renderings of park, major features and unique site features <br />Subtask 3.4: Preparation of Cost Estimates for Preliminary Preferred Conceptual Designs <br />Consultant will prepare three preliminary cost statements for improvements for the park <br />site, including hardscape and landscape features, amenities, electrical, plumbing, moving <br />of items and other related infrastructure improvements for each design. <br />Deliverables: <br />Preliminary cost statement for conceptual infrastructure and major amenities based on the <br />Preferred Plan (1) <br />Preliminary cost statement for conceptual infrastructure and major amenities based on the <br />alternative Conceptual Plans (2) <br />Provide Native Files <br />ATTY/AGR.2022.233/O'Dell Engineering (Hoover Park Master Plan) (Page 17 of 22)