Laserfiche WebLink
REV: 11-09-23 VR <br />1.Task 1 Budget: $63,100 <br />b)Task 2: Construction Documents (50%, 90% and 100% PS&E) – Landscape Architecture and <br />Civil Engineering <br />Following the City’s approval of the design development package, Consultant’s design team will <br />move them into construction documents for submitting to DSA (Division of State Architect). The <br />90% and 100% submittals will verify that previous DSA comments (on the 50% submittal) were <br />addressed appropriately. This phase includes the following: <br />i) General Notes <br />ii) Topographic Survey <br />iii) Existing Conditions and Demolition Plan <br />iv) Tree Protection Recommendations (by in-house arborist) <br />v) Horizontal Control Plan <br />vi) Site Features & Finishes Plan <br />vii) Grading Plan <br />viii)Site Utilities Plan <br />ix) Erosion Control & Sedimentation Control Plan <br />x) Planting Plans <br />xi) Irrigation Plans <br />xii) Construction Details <br />xiii) Front-end specifications (standard sections to be provided to design team by City) <br />xiv) Technical specifications (per CSI Masterspec formats). <br />xv) Bid items and bid descriptions (to be included in the 90% and 100% PS&E packages) <br />xvi) Cost estimates to reflect updated quantities and pricing <br />xvii) Provide MWELO calculations; including required statements & certifications <br />xviii) Complete Stormwater Quality Control Plan and calculations. <br />xix) Preparation of additive / deductive alternates as needed after coordination with city. <br />xx) Coordination with sub-consultants as necessary. <br />xxi) Provide a peer review and provide revisions to plans as required to be submitted for Building <br />Permit <br />xxii)Revise plans to get Building Permits – including up-to two (2) submittals <br />1.Task 2 Budget: $174,850 <br />c)Task 3: SWPPP (Stormwater Pollution Prevention Plan) <br />i) Permit Registration Documents including Risk Assessment, Site specific SWPPP approved by <br />QSD, Site Maps, and NOI for LRP review. <br />1.Task 3 Budget: $4,000; Lump Sum <br />d)Task 4: Aquatic Design Scope of Work (50%, 90% and 100% PS&E) <br />Consultant shall subcontract with a qualified aquatics design firm for all aquatics related <br />project needs. The qualified sub-consultant shall provide services as hereinafter described <br />to assist the City in the detailed design and engineering of a spray ground approximately <br />5,000 SF and a construction value of approximately $1,000,000. <br />i) Design Development Phase: <br />AQUATICS SUB-CONSULTANT shall review the program furnished by the City to ascertain the <br />requirements of the project and shall arrive at a mutual understanding of such requirements <br />ATTY/AGR.2023/Amend. No.1/O'Dell Engineering (Hoover Park Renovation - Design and Management) (Page 5 of 15)