My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt22 Regenesis Bioremediation Products
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2022
>
Agmt22 Regenesis Bioremediation Products
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2022 2:01:23 PM
Creation date
12/16/2022 2:01:00 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Regenesis Bioremediation Products
PROJECT NAME
Remediation of groundwater at Sequoia Station
RMP File Number
304
Date
11/23/2022
MO Ref
22-197
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 10-05-2022 VR <br />Work activities may only be conducted by Consultant under the supervision of the Public <br />Works Director or designee. Consultant work activities may not be initiated until the <br />Public Works Director or designee is on-site. The Public Works Director or designee <br />reserves the right to stop work at any time for failure to comply with these or other <br />policies set forth in the site-specific HASP. <br />Consultant shall adhere to the following health and safety practices during all site <br />activities: <br />Level D personal protective equipment (PPE) is required for all site activities <br />including unloading of supplies and site cleanup; <br />Hearing protection is required during the use of any power equipment <br />producing noise levels above 85 dBA, including jack hammers, air knife, air <br />compressors or asphalt saws; <br />Construction vehicles must be equipped with functional back-up alarms; <br />Required work hazard safety zone set-back distances must be specified in <br />advance of work and adhered to at all times during the work; <br />Machinery should be de-energized when unattended and not in use; and <br />Ground-fault circuit interrupters (GFCI) are required for use with power tools. <br />Eyewash stations, first aid kits, and fire extinguishers shall be available on <br />site. <br />Consultant shall assume that Level D PPE shall be utilized during the project. Consultant <br />shall also assure that Level C PPE is available on-site at all times should an upgrade be <br />required. <br />Consultant shall be responsible for managing the inventory of injection chemicals <br />throughout the project and shall review the injection plan and work schedule prior to <br />beginning work to plan an up-front order and then cross-reference with the chemical <br />inventory for any subsequent orders. <br />Daily safety meetings shall be conducted and led by the Consultant at least twice per <br />day. A safety meeting shall be conducted by the Consultant prior to initiating any site <br />activities and during the work day (i.e. immediately after a meal or lunch break). The <br />Public Works Director or designee may require additional safety meetings during the <br />workday. <br />1.1.2. Preconstruction Kickoff Meeting <br />Consultant shall coordinate a pre-construction kickoff meeting with the Public Works <br />Director or designee, which shall occur at minimum 1 week prior to mobilization. This <br />meeting shall facilitate follow-up on any action items and confirm the project schedule <br />and site access. The meeting shall identify and specify project workflow and logistics. <br />Consultant shall coordinate two separate work crews working simultaneously at the Site, <br />with a total of two drilling rigs and two injection trailers. <br />1.1.3. Site Security, Traffic Control Measures, and Temporary No Parking Zones <br />The parking lot shall remain open to the public and operational during working hours. <br />Consultant shall provide all required traffic control measures and temporary no parking <br />zones for the injection areas and shall provide a plan in addition to the HASP for <br />ATTY/AGR.2022.348/Regenesis Bioremediation Products (Page 12 of 34)
The URL can be used to link to this page
Your browser does not support the video tag.