My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt23 BKF Engineers
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2023
>
Under $104K
>
Agmt23 BKF Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2023 2:52:14 PM
Creation date
4/27/2023 2:51:48 PM
Metadata
Fields
Template:
Agreement
Contractor Name
BKF Engineers
PROJECT NAME
Sewer Isolation valve design
RMP File Number
304.5
Date
4/21/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 3-24-2023 RL <br />from the 65% design submittal. Consultant’s schedule shall allow for a minimum <br />three-week review period by City staff following submission of the 95% design <br />submittal. <br />This stage of work will include: <br />• Preparing 95% Plans and Specifications - Consultant shall update drawings and <br />specifications incorporating City staff comments. Consultant shall continue to <br />develop the construction drawings to include additional details and the City’s <br />boilerplate contract document to the technical specifications. <br />• Preparing 95% Opinion of Probable Construction Cost - Consultant shall update <br />the bid schedule and construction cost estimate based on the comments received <br />for the 95% contract documents and provide a detailed 95% Opinion of Probable <br />Construction Cost. <br />2.2.3. Bid Documents <br />Consultant shall prepare and submit bid-ready construction documents, signed by <br />a California Registered Professional Engineer, based on the City’s 95% design <br />submittal review comments. Consultant shall submit an electronic (PDF) copy, <br />formatted in both half-size and full-size, of the bid submittal. <br />The PDF version of the design drawings will include Consultant’s professional <br />engineering stamp and signature. In addition, Consultant shall submit: AutoCAD <br />(version 2010 or higher) files for all design drawings, technical specifications in MS <br />Word and PDF formats with Consultant’s professional engineering stamp and <br />signature in the PDF file, cost estimates in MS Excel and PDF formats, and the <br />construction schedule in MS Excel. <br />• Final, detailed drawings and technical specification to be included in the contract <br />documents <br />• Final bid item schedule for incorporation into the final contract bid documents <br />• Revised/updated cost estimate based on the 95% design submittal <br />ATTY/AGR.2023.062/BKF Engineers (Redwood Shores Isolation Valve) (Page 14 of 17)
The URL can be used to link to this page
Your browser does not support the video tag.